ASSEMBLY AND INSTALLATION
302842 Rev0 | Sentinel
Page 13 of 61
3
ASSEMBLY AND INSTALLATION
WARNING!
Read all application documentation, including the documentation for equipped
options BEFORE starting assembly and installation, or performing service check and
maintenance on the Sentinel Thermoelectric Generator.
3.1
PREPARATION
Figure 4 – Sentinel TEG Dimensions
The Sentinel TEG must be installed on a non-combustible surface. Allow a minimum clearance of 36”
[900 mm] under the instrumentation enclosure floor, in front and on both sides of the unit, and
above the top of the fin duct. Ensure that the Sentinel TEG is positioned high enough to prevent
flooding or heavy snowfall from interfering with the flow of cooling air.
WARNING!
Operation of the Sentinel
TEG in locations where cooling air flow may be
obstructed will cause overheating. Allow a minimum of 36” [900 mm] clearance
under the instrumentation enclosure floor, in front and on both sides of the unit,
and above the top of the fin duct. Mount the Sentinel TEG high enough to avoid
flooding or snow accumulation interfering with the flow of cooling air.