1.
Create the right side of the shelving units by laying two uprights side-by-side on a flat surface.
Be sure that the short side of the uprights is facing up, as shown in Figure 1.
Important: One side of the uprights
is longer that the other, and contains
two sets of holes. When laying the
uprights side-by-side, this long side
should be on the floor, and the short
side should be facing up.
2.
Attach the two side sway braces, beginning in the 20th
hole from the top of each upright (approximately 20" from the top),
using two
1
/
4
"-20 x
5
/
8
" bolts and nuts. The side sway braces attach
to the longer side of the uprights (the side with two sets of holes). Bolt
the braces into the small holes near the edge of the uprights as shown.
Note the hole pattern of two round holes and then one square hole,
repeating every 3", which should help facilitate proper placement of the
bolts. Finger tighten only at this point.
3.
Attach the other end of both sway braces. The information below will
tell how many holes should be between the top and bottom of the sway braces.
Count the holes carefully, as an incorrect count will cause the upright to be the
wrong depth to hold the shelves.
4.
Repeat steps 1-4 for the left uprights.
Tools Required:
•
7
/
16
" nut driver or socket
• Flathead screwdriver.
• Requires two people
for assembly.
• Approximate assembly time:
15 to 30 minutes per unit.
Note: Number of shelves
per unit varies depending
on unit purchased.
OPEN INDUSTRIAL SHELVING
Assembly
Instructions
Customer Service
1-800-645-2986
1
Starter
Starter & Add On
Back-To-Back
Unit Depth Brace Length Distance Between Bolts
12
"
30
"
27 holes (27
1
/
2
"
)
18
"
30
"
24 holes (24
1
/
2
"
)
24
"
30
"
19 holes (19
1
/
2
"
)
30
"
30
"
10 holes (10
1
/
2
"
)