background image

 

GFE-S and GFE SH 

Detector 

Installation Wiring Diagram

 

TYPICAL WIRING DIAGRAM 

Figure 1(a)

 shows the typical wiring diagram of the 

2-wire multiple-station smoke detector system.

 

IN

IT

IA

T

IN

G

L

O

O

P

E

N

5

4

  L

IS

T

E

D

C

O

M

P

A

T

IB

L

E

C

O

N

T

R

O

L

P

A

N

E

L

+
-

F

IR

S

T

 D

E

T

E

C

T

O

R

 B

A

S

E

L

A

S

T

 D

E

T

E

C

T

O

R

 B

A

S

E

E

O

L

R

E

S

IS

T

O

R

5

2

5

2

6 1

3 4

6 1

3 4

+

-

+

R

E

M

O

T

E

 

IN

D

IC

A

T

O

R

C

L

A

S

S

 A

 O

P

T

IO

N

A

L

 W

IR

IN

G

N

O

T

E

: IF

 R

E

M

O

T

E

 IN

D

IC

A

T

O

R

 IS

 N

O

T

 U

S

E

D

. P

O

L

A

R

IT

Y

 T

O

 D

E

T

E

C

T

O

R

 M

A

Y

 B

E

 R

E

V

E

R

S

E

D

.

-

 

 

Figure  1(b)

  shows  the  typical  wiring  diagram  of  the 

4-wire multiple-station smoke detector system. 

 

 

 

WARNING 

TO 

PREVENT 

DETECTOR 

CONTAMINATION 

AND 

SUBSEQUENT 

WARRANTY 

CANCELLATION, 

THE 

SMOKE  DETECTOR  MUST  REMAIN  COVERED  UNTIL 
THE AREA IS CLEAN AND DUST FREE. 

INSTALLING THE BASE 

1. To insure proper installation of the detector head to the 

base,  all  the  wires  should  be  properly  addressed  at 
installation: 
(A) Position all the wires flat against terminals. 
(B) Fasten the wires away from connector terminals. 

2. If  you  use  a  jumper  wire  to  connect  the  poles  of 

terminal  2  and  5  when  testing  the  detector  loop 
continuity,  be  sure  to  remove  the  jumper  wire  prior  to 
the installation of the detector head. 

3. The  end-of-line  device  shown  in  fig.  1(a)  and  1(b) 

should  be  compatible  with  the  control  unit.  The 
end-of-line  supervisory  relay  used  should  be  rated  for 
the DC power voltage used. 

4. Open area smoke detectors are intended for mounting 

on  a  ceiling  or  a  wall  in  accordance  with  the  fire 
standard in your country. 

5. The  base  of  the  smoke  detector  can  be  mounted 

directly  onto  an  electrical  junction  box  such  as  an 
octagonal (75mm, 90mm or 100mm), a round (75mm), 
or  a  square  (100mm)  box  without  using  any  type  of 
mechanical adapter. 

INSTALLING THE HEAD 

1. Align the components as shown in Figure 2. 
2. Mate the detector head onto the base and twist 

clockwise to secure it. 

3. 

Do  not  install  the  detector  head  until  the  area  is 

thoroughly  cleaned  of  construction  debris,  dusts,  etc. 
The  maximum  number  of  smoke  detector  installed  in 
the same detection zone is typically  30 units. Refer to 
control panel manual. 

 
 
 
 
 
 

 

 

Fig. 2 Fitting detector head onto base

 

ADJUSTING THE RELAY FOR NO/NC 

The normal condition for the relay is 

normally open

 

(NO). 

1. To adjust the normal condition of the relay to 

normally closed

 (NC), insert a screwdriver into the 

rectangular hole located on the side between the front 
cover and base and rotate to remove the front cover. 

2. Refer to figure 3. There is a jumper head next to the 
relay on the PCB. Remove the jumper head and reinsert 
it in the NC position. 
3. Carefully replace the front cover. 
    Relay contact rating:     

1A@30VDC,   

    0.5A@125VAC

. 

 
 
 

 

 

 

 

TESTING 

1.  All  remote  signaling  systems,  releasing  devices  and 

extinguishing  systems  should  be  disconnected 

during  the  test  period  and  reconnected  at  the 

conclusion of testing. 

2.  After  energizing  the  detector  head  for  approximately 

one  minute,  check  to  see  the  indicator  green  LED 
flashing once every 3~5 seconds. If green LED fails to 
flash, it indicates the non-functioning of the detector or 
faulty  wiring.  Re-check  the  wiring  or  replace  the 
detector if necessary. 

3.  Allow  smoke  from  a  cotton  wick  or  a  test  smoke 

aerosol  to  enter  the  detector-sensing  chamber  for  at 
least 10 seconds. When sufficient smoke  has  entered 
the  chamber,  the  detector  will  signal  an  alarm,  this 
being  visible  by  a  continuous  illumination  of  the  LED. 
Reset  each  detector  and/or  control  unit  before 
attempting to test any additional detectors in the same 
zone.  If  the  alarm  fails  in  this  step,  it  indicates  a 
defective unit, which requires service. 

Fig. 3 Schematic of detector structure 
            When front cover is open. 

Reviews: