Fido 25
Dog Waste Unit Installation Instructions
GROUND LOCK AND POST FIXING SYSTEM
Important note: Ensure that all relevant personnel read the points listed below and that a copy
is passed on to staff involved with the installation.
YOU SHOULD HAVE
1x Fido 25 outer c/w lid (optional liner)
1x Metal post
1x Two hole washer plate
4x M8 x 20mm hex head screws
2x Penny washers 5/16 x 1/4"
1x Ground-Lock socket system
1x M10 Bolt
1x M10 washer
1x Installation cap (if requested)
1x Special insertion tool (if requested)
1x Socket block (if requested)
YOU WILL NEED
17mm wrench
13mm box wrench
Sledge hammer
Rigger gloves
Safety boots
Important: When selecting a site for the Fido Unit ensure there are no buried services.
®
TM
DO NOT REMOVE
THIS STICKER
WHEN INSTALLING
CROSS SECTION VIEW OF INSTALLED
'GROUND LOCK' AND POST FIXING SYSTEM
Height
(above ground)
42”
Depth
(below ground)
34”
ground socket
Barb
STAGE ONE
Push Fido socket spike into the ground in a vertical position and
insert installation cap into the socket.
NOTE: In hard ground conditions a two man operation may be
required to achieve a satisfactory installation.
Hammer the socket into the ground with even strokes until
horizontal brackets affixed to the top of the socket are level with
the ground. Remove and retain cap for future use.
STAGE TWO
Take the socket block and screw clockwise on to the end of the
special insertion tool provided, ensure block is screwed hand tight
to the end of the thread. Then using the tool insert the block into
the socket.
STAGE THREE
Ram the 'ground lock' into position, when the red arrow on the
sticker on the tool is level with the top of the socket the 'ground
lock' is fully engaged. Twist the socket tool anti clockwise to
separate the tool from the block. Remove the tool from the
socket and retain for future use.
Installation cap