Glasdon Fido 25 Installation Instructions Download Page 1

Fido 25 

Dog Waste Unit Installation Instructions

GROUND LOCK AND POST FIXING SYSTEM

Important note: Ensure that all relevant personnel read the points listed below and that a copy 

is passed on to staff involved with the installation.

YOU SHOULD HAVE

1x Fido 25 outer c/w lid (optional liner)

1x Metal post

1x Two hole washer plate

4x M8 x 20mm hex head screws

2x Penny washers 5/16 x 1/4"

1x Ground-Lock socket system

1x M10 Bolt

1x M10 washer

1x Installation cap (if requested)

1x Special insertion tool (if requested)

1x Socket block (if requested)

YOU WILL NEED

17mm wrench

13mm box wrench

Sledge hammer

Rigger gloves

Safety boots

Important: When selecting a site for the Fido Unit ensure there are no buried services.

®

TM

DO NOT REMOVE 

THIS STICKER 

WHEN INSTALLING

CROSS SECTION VIEW OF INSTALLED

'GROUND LOCK' AND POST FIXING SYSTEM

Height

(above ground)

42”

Depth

(below ground)

34”

ground socket

Barb

STAGE ONE

Push Fido socket spike into the ground in a vertical position and 

insert installation cap into the socket.
NOTE: In hard ground conditions a two man operation may be 

required to achieve a satisfactory installation.
Hammer the socket into the ground with even strokes until 

horizontal brackets affixed to the top of the socket are level with 

the ground.  Remove and retain cap for future use.

 

STAGE TWO

Take the socket block and screw clockwise on to the end of the 

special insertion tool provided, ensure block is screwed hand tight 

to the end of the thread.  Then using the tool insert the block into 

the socket.

 

STAGE THREE

Ram the 'ground lock' into position, when the red arrow on the 

sticker on the tool is level with the top of the socket the 'ground 

lock' is fully engaged.  Twist the socket tool anti clockwise to 

separate the tool from the block.  Remove the tool from the 

socket and retain for future use.

 

Installation cap