background image

ECO NEXUS CUP RECYCLING STATION

1.

To access the internal 
compartments, lift the Lid 
(ITEM 1) off the Bin Body 
(ITEM 2).

PLACING SACK INTO POSITION

To install sacks, firstly insert into 
the Sack Retention Slots (ITEM 3) 
then stretch over the outer rim 

Lower Lid to replace, ensuring
sacks are neatly secured
underneath.

2.

3.

Ensure that all personnel read the points listed within this leaflet and that a copy is given to staff involved with 

the installation and maintenance of this product. Glasdon recommends that a full Health and Safety analysis 

is carried out prior to use.

COMPONENTS:

ITEM 1 -  Lid   

1 of 4

4

1

6

2

ITEM 3 -  Sack Retention Slots    
ITEM 4 -  Internal Cradle 
ITEM 5 -  Cup Stacking Tubes

3

ITEM 2 -  Bin Body

5

ITEM 6 -  Liquid Reservoir

ECO NEXUS  CUP RECYCLING STATION

OPERATIONAL INSTRUCTIONS

TM

Reviews: