Installation (continued)
13
11
Installing the escutcheon
and handle assembly
□
Place the installation plate (E) and escutcheon (F)
onto the valve body (D). Attach the handle
assembly (G) by threading the base of the handle
assembly (G) onto the valve body (D) and twisting
clockwise until secure. Do not overtighten the
handle assembly (G) as this could damage
the escutcheon (F).
HOMEDEPOT.COM
Please contact 1-855-HD-GLACIER for further assistance.
12
Checking for leaks
□
□
Turn the handle (G) to the full on mixed position.
When the valve body (D) is turned on, water
normally flows through the tub spout (K). To
activate the shower, turn the valve on and pull
the knob (1) up. Hold the knob (1) until the water
flows continuously from the shower arm (B).
Check for leaks.
Shut off the water at the faucet and supply lines.
□
UP
FOR
SHOWER
NOTE:
When the pattern of the water flow switches to
the shower from the tub spout, some low leakage from the
tub spout is a normal occurrence.
D
Down
E
F
G
K
D
G
B
1