Gira Powernet Switchactuator 2fold Installation Instructions Download Page 1

GIRA

 

Info

 

 

Powernet Switchactuator 2fold/4fold 

Installation Instructions 

 

 

Powernet Switchactuator 2fold/4fold 

03/99 

Page: 1 of 3 

Powernet Switchactuator 2fold

 

Art. Nr.: 0430 00 

 

Powernet Switchactuator 4fold

 

Art. Nr.: 0433 00 

 

 

4 5 6

1 2 3

A1

A2

N

L

µ

N N

L

L

c

d
e

50 Hz

230 V AC~

 

 
 

10 11 12

7 8 9

A3

A4

N

L

µ

N N

L L

c

d
e

50 Hz

230 V AC~

4 5 6

1 2 3

A1

A2

µ

 

 

System Information 

This device is a product of the GIRA-Powernet 

®

 

EIB system and complies with EIBA directives. 
Detailed technical knowledge obtained in 

instabus

 or 

GIRA-Powernet 

®

 EIB training courses is a pre-

requisite to proper understanding.  
The functionality of this device depends upon the 
software. Detailed information on loadable software 
and attainable functionality may be taken from the 
manufacturer’s ETS2 product database as well as 
from the GIRA-Powernet 

®

 EIB controller database. 

 
Planning, installation and commissioning of the unit 
is done by means of the ETS2 software, Ver. 1.1 or 
later, as well as by the GIRA-Powernet 

®

 EIB con-

troller. 
 
 

Function 

The Switchactuator allows two (or, respectively, 
four) groups of loads to be switched independent of 
each other.  
 
 

Connection 

Establish electrical connection as shown in the 
opposite illustration.  
 
Where: 

c

 GIRA-Powernet 

® 

EIB connection. 

d

 Programming 

key. 

e

 Programming 

LED 

 
The connection of different external leads to the 
channels is admissible. 
 

Indications of danger 

Caution! The installation and assembly of 
electrical equipment may be carried out only by 
a skilled person. Do not connect any loads/types 
of load other than specified. 
 

Subject to change without notice. 

Reviews: