2-7
Installation
2
Plumbing Connections
Plumbing Connections
Transfer Tubing Installation
1 Connect one end of each piece of transfer
tubing to the 444 QuadDilutor. Refer to the 444
QuadDilutor User’s Guide for more information.
2 Locate the level sensing cables (LLD cables)
supplied with the Z-arm.
3 Pass the other end of each transfer tubing
through the open end of an LLD cable casing
nearest the right-angle connector. The tubing
should exit the back of the LLD cable casing
approximately 6.5 cm from the end.
4 Connect each tubing to the top of the isolation
probe holder using a 1/4"-28 nut and ferrule
supplied with the tubing. Firmly tighten this
fitting using the supplied headless nut extender
(part number 49041032) since it holds the probe
in place.
Summary of Contents for Quad-Z 215
Page 1: ...Quad Z 215 Liquid Handler User s Guide LT2545 2003 Gilson Inc All rights reserved April 2003...
Page 2: ......
Page 6: ......
Page 8: ......
Page 15: ...1 7 Introduction 1 Technical Specifications...
Page 16: ...1 8 Introduction 1 Technical Specifications...
Page 72: ......
Page 73: ...5 1 5 Troubleshooting...
Page 82: ......