37
EOF SERIES FRYERS
Giles takes pride in the quality of its workmanship. Each unit passes rigorous quality control inspection and testing prior
to shipment, and every effort has been made to ensure that the unit is in perfect operating condition when received. To
further ensure a smooth start-up, a brief operational check-out of the new fryer should be conducted as described in
this section.
Start-up assistance and basic operational training by a factory-approved service agent can be arranged if desired. Such
service is
not included
as part of the Fryer purchase and the cost of such service is the responsibility of the purchaser.
Call Giles at 800.554.4537 for more details.
1. Power Switch
①
and Heat Switches
②
are in the
[OFF]
position.
1
2
4.1.
Set-up for Initial Checkout
1
2
2
EOF-20 or EOF-24
EOF10-10
Before attempting to operate the Unit, please refer to
Section 3
and become familiar with the various controls
and their function. After you have read and fully understand
Section 3
, please follow the steps described below
... precisely follow them to avoid possible equipment damage or malfunction.
4. Installation Check-out & Prep
Please ensure Control Panel switches and Lower Cabinet valves are set as follows before proceeding to each test. The
check-out procedures described in the subsequent Sections should be performed for each unit of the banked unit.
NOTE:
Each Fryer in the bank must be set
accordingly.
Continued on Next Page
Installation Check-out / Prep
Summary of Contents for EOF Series
Page 2: ......
Page 4: ......
Page 8: ...vi Table Of Contents EOF SERIES FRYERS Notes ...
Page 16: ...4 Introduction EOF SERIES FRYERS ...
Page 22: ...10 Installation EOF SERIES FRYERS ...
Page 30: ...Overview 18 3 4 Control Panel EOF 20 EOF 24 6 5 4 3 2 1 7 EOF SERIES FRYERS 8 9 3 1 3 2 ...
Page 32: ...20 Overview 3 5 Control Panel FFLT Dump Station 1 EOF SERIES FRYERS ...
Page 36: ...24 Overview EOF SERIES FRYERS 3 7 Lower Cabinet EOF 20 EOF 24 2 1 1 2 EOF 24 EOF 20 ...
Page 38: ...26 Overview EOF SERIES FRYERS 2 1 3 8 FFLT Dump Station ...
Page 40: ...28 Overview EOF SERIES FRYERS 1 2 3 4 5 6 3 9 FFLT Lower Cabinet Filter Pan ...
Page 42: ...30 Overview EOF SERIES FRYERS 5 6 3 2 1 4 3 3 10 Filter Pan Assembly Detail ...
Page 100: ...88 Troubleshooting EOF SERIES FRYERS NOTES ...
Page 112: ...100 Parts List EOF SERIES FRYERS Not shown 1 3 2 5 4 7 6 8 8 7 EOF 20 Front Lower Cabinet ...
Page 118: ...106 Parts List EOF SERIES FRYERS Not shown 2 3 4 6 1 5 2 8 10 EOF 24 Rear Lower Cabinet ...
Page 120: ...108 Parts List EOF SERIES FRYERS 1 3 4 5 7 8 2 6 8 11 FFLT Cabinet Front ...
Page 122: ...110 Parts List EOF SERIES FRYERS 2 1 Not shown 4 3 8 12 FFLT Cabinet Rear ...
Page 126: ...114 Parts List EOF SERIES FRYERS Notes ...
Page 127: ......