background image

 

 

 

 

CPE Installation Note

 

 DCP0000072(D) 

 

This installation note is applicable for SkyEdge II-c Gemini/Capricorn and Gemini S2X CPE 

with an external power adapter. 

 

To install the SkyEdge II-c CPE, the installer must:  

 

Complete Gilat VSAT Installer course 

 

Be familiar with the SkyEdge II-c CPE Installation Manual (DC-103322-X) 

 

Have the CPE configuration parameters available

 

 

 

VSAT AC and DC power supplies are provided by Gilat. If the power to the 

VSAT is not through an AC or DC adaptor (e.g., batteries, solar panels, 

rectifier ETC), the power solution must be approved by the Gilat Technical 

Support. 

 

 

 

C

AUTION

 

 

T

HE 

CPE

 MUST BE GROUNDED PRIOR TO INSTALLATION BY ATTACHING ONE END 

OF THE GROUNDING CABLE TO THE GROUNDING STUD ON THE REAR OF THE 

CPE,

 

AND THE OTHER  END TO THE SITE MAIN GROUND CONNECTION

.

 

18AWG

 

GROUNDING CABLE SHOULD BE USED

 

T

HE 

CPE

 MUST BE CONFIGURED PRIOR TO ATTACHING THE 

RF

 CABLES

 

T

HE POWER CABLE MUST BE DISCONNECTED FROM THE 

CPE

  PRIOR TO 

CONNECTING THE 

RF

 CABLES

.

 

 

 

 

 

C

AUTION

 

I

N ORDER TO PREVENT DAMAGE TO THE 

RF

 

C

ONNECTORS

,

 SECURE THE CABLES TO 

A PERMANENT

,

 STATIC OBJECT SUCH AS A TABLE OR PIPE

,

 AT A DISTANCE OF 

25-60

 

CM 

(10-25

 IN

.)

 FROM THE 

CPE,

 PRIOR TO CONNECTION

.

 

 

 

General Precautions 

 

Do not block the ventilation openings of the CPE. 

 

Do not place the CPE in a location that would deviate from typical ambient 

environmental conditions of temperature, humidity and moisture. 

 

Do not place any object on top of the CPE. 

 

  

 

Warning

 

B

EFORE INSTALLING THE UNIT

,

 VERIFY THAT THE ANTENNA AND 

AC

 POWER CORD ARE 

GROUNDED SO AS TO PROVIDE PROTECTION AGAINST VOLTAGE SURGES AND STATIC 
CHARGES

S

ECTION 

810

 OF THE 

US

 

N

ATIONAL 

E

LECTRICAL 

C

ODE

,

 

ANSI/NFPA

 

70,

 AND 

S

ECTION 

54

 OF THE 

C

ANADIAN 

E

LECTRICAL 

C

ODE PROVIDE INFORMATION WITH 

REGARD TO PROPER GROUNDING OF THE MAST AND SUPPORTING STRUCTURE

,

 

GROUNDING OF THE LEAD

-

IN WIRE TO AN ANTENNA DISCHARGE UNIT

,

 SIZE OF 

GROUNDING CONDUCTORS

,

 LOCATION OF ANTENNA DISCHARGE UNIT

,

 CONNECTION TO 

GROUNDING ELECTRODES AND REQUIREMENTS FOR THE GROUNDING ELECTRODE

.

 

 

 

 

 

Reviews: