
7
Operation
Mounting Implement onto tractor:
Ensure all safety notes have been read, and fully understood
before attaching or using the GSP Transport Box.
Step 1:
Ensure Transport box is on level ground and that there
are no obstructions to impede access to the 3-point linkage.
Step 2:
Carefully reverse tractor until arms are in correct
position to attach onto arm linkage of Transport box.
Step 3:
After arm linkage has been attached securely
, the
tractor top link should be adjusted to suitable length and
attached to tractor and transport box.
Step 4:
Ensure tripping rope is anchored in a location where it
can be easily accessed by the operator. i.e. close to back
window of tractor, within arm’s reach of operator.
NOTE: Ensure tripping rope is in good condition and is not
damaged before use. If it appears damaged or frayed, it
should be replaced immediately before further use.