Gibney Steel Products T2 4ft User Handbook Manual Download Page 7

 

Operation

 

Mounting Implement onto tractor: 

 

Ensure all safety notes have been read, and fully understood 
before attaching or using the GSP Transport Box. 

Step 1: 

Ensure Transport box is on level ground and that there 

are no obstructions to impede access to the 3-point linkage. 

Step  2:

  Carefully  reverse  tractor  until  arms  are  in  correct 

position to attach onto arm linkage of Transport box.  

Step  3:

 

After  arm  linkage  has  been  attached  securely

,  the 

tractor  top  link  should  be  adjusted  to  suitable  length  and 
attached to tractor and transport box. 

Step 4: 

Ensure tripping rope is anchored in a location where it 

can  be  easily  accessed  by  the  operator.  i.e.  close  to  back 

window of tractor, within arm’s reach of operator.

 

NOTE:  Ensure  tripping  rope  is  in  good  condition  and  is  not 
damaged  before  use.  If  it  appears  damaged  or  frayed,  it 
should be replaced immediately before further use. 

 

 

 

 

Summary of Contents for T2 4ft

Page 1: ...NEY STEEL PRODUCTS LTD T2 Transport Box 4ft 5ft 6ft USER S HANDBOOK GIBNEY STEEL PRODUCTS LTD Moylagh Oldcastle Co Meath Tel 049 8541302 Fax 049 8541760 Email sales gibneysteel com Web www gibneysteel...

Page 2: ...tents Introduction 3 Safety Notes 3 Maintenance 6 Operation 7 Mounting Implement onto tractor 7 Using The Transport Box 8 EU DECLARATION of CONFORMITY 9 European Standards 10 Standard Conditions of Sa...

Page 3: ...u an explanation on the operation and maintenance of the Transport Box It is important that you read and understand these instructions before operating this machine for the first time Anyone within th...

Page 4: ...ised personnel operate the implement It is the responsibility of the owner to ensure that there are no third persons or animals within the area of the machine before operation Ensure the Transport Box...

Page 5: ...O NOT make any attempts to manually move the implement DO NOT attach the implement to a tractor which would become unstable when the implement is being operated at its full capacity Take note of the m...

Page 6: ...ving parts should be checked before use to ensure nothing is worn or damaged and to ensure none of the fasteners have become loose over time Ensure that all hinges are greased frequently and check for...

Page 7: ...sition to attach onto arm linkage of Transport box Step 3 After arm linkage has been attached securely the tractor top link should be adjusted to suitable length and attached to tractor and transport...

Page 8: ...ing on the rope to trip the box empty a load To reset the box back to its fixed position simply drop the box to ground level where the trip mechanism will automatically reset Always ensure the trippin...

Page 9: ...9 EU DECLARATION of CONFORMITY...

Page 10: ...ly practicable all appropriate EU standards have been employed The following harmonised standards are an example of standards employed during the design and construction of the assembly EN ISO 12100 2...

Page 11: ...11 Spare Parts Item Description Part No Quantity 1 Dual Implement Pin Z202235 2 2 Linch Pins 7 16 P385 2 3 Linch Pins 1 4 P384 2 4 Spring GSP SPR01 1 McHugh Components Part Numbers...

Page 12: ...the Supplier 2 Warranties The Supplier warrants that At the time of sale it will have title to see the goods to the customer and the goods sold to the customer will conform to the specification for t...

Reviews: