Gibney Steel Products T2 4ft User Handbook Manual Download Page 3

 

Introduction 

The  Transport  Box  you  have  just  purchased  has  been 
manufactured  by  Gibney  Steel  Products  of  Oldcastle,  Co. 
Meath.  Provided  the  instructions  for  the  operation  and 
maintenance of this unit are followed, the equipment will work 
perfectly for many years. 

Safety Notes 

 

The  health  and  safety  of  the  operator  is  paramount 
while operating the Transport Box.   
 

 

Your supplier, on delivery,  should have  given you an 
explanation on the operation and maintenance of the 
Transport  Box.    It  is  important  that  you  read  and 
understand  these  instructions  before  operating  this 
machine for the first time.  
 

 

Anyone  within  the  vicinity  of  the  machine  must 
observe a safe distance of at least 5 metres from the 
implement. 
 

 

All  personnel  who  are  involved  in  the  authorisation, 
operation and maintenance of the machine must have 
read  and  understood  this  User  Manual  before 
operating the Transport Box. 
 

 

Incorrect use or mishandling of the machine can lead 
to  injury  of  the  operator,  other  persons  or  animals 
within the area of the machine. 
 

Summary of Contents for T2 4ft

Page 1: ...NEY STEEL PRODUCTS LTD T2 Transport Box 4ft 5ft 6ft USER S HANDBOOK GIBNEY STEEL PRODUCTS LTD Moylagh Oldcastle Co Meath Tel 049 8541302 Fax 049 8541760 Email sales gibneysteel com Web www gibneysteel...

Page 2: ...tents Introduction 3 Safety Notes 3 Maintenance 6 Operation 7 Mounting Implement onto tractor 7 Using The Transport Box 8 EU DECLARATION of CONFORMITY 9 European Standards 10 Standard Conditions of Sa...

Page 3: ...u an explanation on the operation and maintenance of the Transport Box It is important that you read and understand these instructions before operating this machine for the first time Anyone within th...

Page 4: ...ised personnel operate the implement It is the responsibility of the owner to ensure that there are no third persons or animals within the area of the machine before operation Ensure the Transport Box...

Page 5: ...O NOT make any attempts to manually move the implement DO NOT attach the implement to a tractor which would become unstable when the implement is being operated at its full capacity Take note of the m...

Page 6: ...ving parts should be checked before use to ensure nothing is worn or damaged and to ensure none of the fasteners have become loose over time Ensure that all hinges are greased frequently and check for...

Page 7: ...sition to attach onto arm linkage of Transport box Step 3 After arm linkage has been attached securely the tractor top link should be adjusted to suitable length and attached to tractor and transport...

Page 8: ...ing on the rope to trip the box empty a load To reset the box back to its fixed position simply drop the box to ground level where the trip mechanism will automatically reset Always ensure the trippin...

Page 9: ...9 EU DECLARATION of CONFORMITY...

Page 10: ...ly practicable all appropriate EU standards have been employed The following harmonised standards are an example of standards employed during the design and construction of the assembly EN ISO 12100 2...

Page 11: ...11 Spare Parts Item Description Part No Quantity 1 Dual Implement Pin Z202235 2 2 Linch Pins 7 16 P385 2 3 Linch Pins 1 4 P384 2 4 Spring GSP SPR01 1 McHugh Components Part Numbers...

Page 12: ...the Supplier 2 Warranties The Supplier warrants that At the time of sale it will have title to see the goods to the customer and the goods sold to the customer will conform to the specification for t...

Reviews: