background image

2

CAUTION:

CAUTION:

CAUTION:

CAUTION: This

This

This

This product

product

product

product must

must

must

must be

be

be

be installed

installed

installed

installed by

by

by

by well-trained

well-trained

well-trained

well-trained skilled

skilled

skilled

skilled

professionals

professionals

professionals

professionals in

in

in

in compliance

compliance

compliance

compliance with

with

with

with the

the

the

the regulations

regulations

regulations

regulations concerning

concerning

concerning

concerning the

the

the

the field

field

field

field

swing

swing

swing

swing gates

gates

gates

gates opener

opener

opener

opener device.

device.

device.

device. Unqualified

Unqualified

Unqualified

Unqualified personnels

personnels

personnels

personnels or

or

or

or those

those

those

those who

who

who

who do

do

do

do

not

not

not

not know

know

know

know the

the

the

the standards

standards

standards

standards applicable

applicable

applicable

applicable in

in

in

in this

this

this

this field

field

field

field should

should

should

should not

not

not

not carry

carry

carry

carry out

out

out

out

the

the

the

the installation

installation

installation

installation under

under

under

under any

any

any

any circumstances.

circumstances.

circumstances.

circumstances.

Every

Every

Every

Every time

time

time

time must

must

must

must cut

cut

cut

cut off

off

off

off power

power

power

power supply

supply

supply

supply before

before

before

before starting

starting

starting

starting installation,

installation,

installation,

installation,

operation

operation

operation

operation or

or

or

or maintenance.

maintenance.

maintenance.

maintenance.

Please

Please

Please

Please read

read

read

read the

the

the

the manual

manual

manual

manual carefully

carefully

carefully

carefully before

before

before

before installation.

installation.

installation.

installation. Incorrect

Incorrect

Incorrect

Incorrect

installtion

installtion

installtion

installtion or

or

or

or misuse

misuse

misuse

misuse of

of

of

of product

product

product

product may

may

may

may cause

cause

cause

cause seriously

seriously

seriously

seriously hurt

hurt

hurt

hurt on

on

on

on people

people

people

people or

or

or

or

damage

damage

damage

damage on

on

on

on other

other

other

other objectives.

objectives.

objectives.

objectives.

If

If

If

If the

the

the

the supplied

supplied

supplied

supplied wires

wires

wires

wires damaged

damaged

damaged

damaged or

or

or

or broken,

broken,

broken,

broken, it

it

it

it must

must

must

must be

be

be

be replaced

replaced

replaced

replaced by

by

by

by

the

the

the

the manufacturer,

manufacturer,

manufacturer,

manufacturer, its

its

its

its service

service

service

service agent

agent

agent

agent or

or

or

or qualified

qualified

qualified

qualified persons

persons

persons

persons in

in

in

in order

order

order

order to

to

to

to

avoid

avoid

avoid

avoid any

any

any

any hazard.

hazard.

hazard.

hazard.

Keep

Keep

Keep

Keep the

the

the

the wireless

wireless

wireless

wireless control

control

control

control system

system

system

system (push-button,

(push-button,

(push-button,

(push-button, transmitters

transmitters

transmitters

transmitters etc)

etc)

etc)

etc)

out

out

out

out of

of

of

of the

the

the

the reach

reach

reach

reach of

of

of

of children.

children.

children.

children.

Not

Not

Not

Not allow

allow

allow

allow children

children

children

children or

or

or

or other

other

other

other persons

persons

persons

persons to

to

to

to stand

stand

stand

stand near

near

near

near the

the

the

the motor

motor

motor

motor

while

while

while

while in

in

in

in operation.

operation.

operation.

operation.

Not

Not

Not

Not allow

allow

allow

allow to

to

to

to use

use

use

use transmitters

transmitters

transmitters

transmitters to

to

to

to control

control

control

control the

the

the

the gate

gate

gate

gate when

when

when

when it

it

it

it is

is

is

is out

out

out

out

of

of

of

of sight.

sight.

sight.

sight.

Not

Not

Not

Not allow

allow

allow

allow to

to

to

to install

install

install

install the

the

the

the products

products

products

products at

at

at

at the

the

the

the place

place

place

place where

where

where

where is

is

is

is corrosive,

corrosive,

corrosive,

corrosive,

inflammable,and

inflammable,and

inflammable,and

inflammable,and explosive.

explosive.

explosive.

explosive.

The

The

The

The manually

manually

manually

manually released

released

released

released part

part

part

part of

of

of

of front

front

front

front motor

motor

motor

motor can

can

can

can not

not

not

not be

be

be

be installed

installed

installed

installed

to

to

to

to the

the

the

the place

place

place

place where

where

where

where passerby

passerby

passerby

passerby could

could

could

could touch

touch

touch

touch when

when

when

when gate

gate

gate

gate closed.

closed.

closed.

closed.

Please

Please

Please

Please keep

keep

keep

keep this

this

this

this instruction

instruction

instruction

instruction for

for

for

for further

further

further

further reference.

reference.

reference.

reference.

Summary of Contents for JJ-PKM-C01

Page 1: ...01 JJ PKM C01 JJ PKM C01 JJ PKM C01 USER USER USER USER MANUAL MANUAL MANUAL MANUAL TEL TEL TEL TEL NO 86 595 22499516 NO 86 595 22499516 NO 86 595 22499516 NO 86 595 22499516 FAX FAX FAX FAX NO 86 595 22492516 NO 86 595 22492516 NO 86 595 22492516 NO 86 595 22492516 WEBSITE WEBSITE WEBSITE WEBSITE www giantautogate com www giantautogate com www giantautogate com www giantautogate com ...

Page 2: ...damaged damaged damaged damaged or or or or broken broken broken broken it it it it must must must must be be be be replaced replaced replaced replaced by by by by the the the the manufacturer manufacturer manufacturer manufacturer its its its its service service service service agent agent agent agent or or or or qualified qualified qualified qualified persons persons persons persons in in in in ...

Page 3: ... OPENER OPENER OPENER TECHNICAL TECHNICAL TECHNICAL TECHNICAL PARAMETERS PARAMETERS PARAMETERS PARAMETERS Input Voltage 24VDC 40W Rotational Speed 250RPM Rod s Running Speed 1 6cm s Rod s Max Travel 300mm Continue running time 5min Max Single leaf Length 2 5m 2 Travel Max Single leaf Weight 200KG Environment Temperature 20 C 50 C Protection Calss IP55 ...

Page 4: ...4 3 SPEC 3 SPEC 3 SPEC 3 SPEC SIZE SIZE SIZE SIZE Fig 3 ...

Page 5: ...5 5 INSTALLATION 5 INSTALLATION 5 INSTALLATION 5 INSTALLATION DESCRIPTION DESCRIPTION DESCRIPTION DESCRIPTION 5 1 Required tools for installation Fig 4 5 2 Installation diagram Fig 5 Fig 6 ...

Page 6: ...6 5 3 Installation size Fig 7 5 4 Description of installation Fig 8 Different connecting method for front and rear bracket ...

Page 7: ... installation method according to different material and environment for front bracket Connection for rear bracket and motor The height difference for installing the front and rear bracket Installation for front bracket ...

Page 8: ...8 Open the gate manually Release by spanner then lift it ...

Page 9: ...ol Control Control Panel Panel Panel Panel 1 1 1 1 Technical Technical Technical Technical Parameters Parameters Parameters Parameters 1 Control Panel Voltage Input 220VAC 2 Motor s Voltage 12VDC 24VDC 3 Encoder For transmitter Our own customed rolling code 4 Support remote control Can memorize 20PCS transmitters at most 5 Range of application Suit for all double arms swing gate opener ...

Page 10: ...ng code state or removing code state it flashes twice after successfully learning code or removing code 2 Transmitter using our company own customed rolling code Singe leaf button controls opening and closing of MOTOR2 double leaf button simultaneously controls opening and closing of MOTOR1 MOTOR2 The control panel can memorize 20 transmitters at most 3 Code learning press and hold learning button...

Page 11: ...motor installed at the side of door with thrust plate MOTO2 DELAY Wiring of motor2 should connect wires of the motor which you could use single leaf button to control 24V 12V 12V 0V 0V 12V Supply AC 12V 2 switch high speed running to low speed running Supply DC 12V Motor only runs in low speed Need to adjust HSPEED TIME trimmer to the minimum position Supply DC 24V 12V together switch high speed r...

Page 12: ...rough HSPEED TIME trimmer When the trimmer turns to the minimum it s 0s the high speed running disabled the motor keeps running in low speed Only when both motors working then high speed running timing enabled 8 Limit obstacle sensitivity adjustment During the opening and closing the motor stops running once the limit obstacle sensitivity signals sensed Sensitivity of the two motors are set sepera...

Page 13: ...ct the motor 12 Motor direction indentification When one side of door installed thrust plate or the contoller has function of setting order of opening closing or functions of swiping card make sure all the wiring connections of 2 motors are correct When the motor is running if motor direction LED indicator is blue now the motor should be in opening operation if no please exchange the wiring connec...

Reviews: