Fundamental safety precautions

Fundamental safety precautions

 

X

Please also note the fundamental safety precautions in the installation instructions for the Powerdrive PL-HT 

sliding door system.

2.1  Intended use

The Powerdrive PL-HT sliding door system is suitable for the construction of an automatic sliding door system 

that is designed for use in the medical field and in areas with high hygienic requirements. 

The completely assembled and tested Powerdrive PL-HT drive unit must be assembled and put into operation in 

accordance with the pre-installation instructions for the Powerdrive PL-HT sliding door system.

The sliding door system is used for the automatic opening and closing of a building passage. 

The sliding door system may only be used in a vertical installation position and in dry rooms within the permit-

ted application area (see installation and service instructions).

The sliding door system is designed for pedestrian traffic in buildings. 

The sliding door system is not designed for the following uses:

 

à

for industrial use

 

à

for areas of application which do not serve pedestrian traffic (such as garage doors)

 

à

on mobile objects such as ships

The sliding door system may only be used:

 

à

in the modes of operation provided for by GEZE

 

à

with the components approved / released by GEZE

 

à

with the software delivered by GEZE

 

à

in the installation variants / types of installation documented by GEZE

 

à

within the tested/approved area of application (climate / temperature / IP rating)

Any other use is considered non-intended and will lead to the exclusion of all liability and warranty claims to GEZE. 

2.2  Safety notices

 

à

Intervention and modifications which influence the safety technology and functionality of the door system 

may only be carried out by GEZE. 

 

à

Problem-free and safe operation assumes proper transportation, proper set-up and installation, qualified 

operation and correct maintenance have taken place.

 

à

The relevant accident prevention regulations and other generally recognised safety-related or health & safety 

rules must be kept. 

 

à

Only original accessories, original spare parts and accessories approved by GEZE guarantee problem-free 

function of the door system.

 

à

The mandatory installation, maintenance and repair work must be performed by properly trained personnel 

authorised by GEZE.

 

à

The country-specific laws and regulations are to be observed during safety-related tests.

 

à

GEZE is not liable for any injuries or damage whatsoever resulting from unauthorised changes to the system.

 

à

GEZE does not accept any warranty for combinations with third-party products.

 

à

Furthermore, only original GEZE parts may be used for repair and maintenance work.

 

à

The connection to the mains voltage must be made by a professional electrician. Perform the power connec-

tion and equipment earth conductor test in accordance with VDE 0100 Part 610.

 

à

Use an on-site 10-A overload cut-out as the line-side disconnecting device.

 

à

Protect the display programme switch against unauthorised access.

 

à

In compliance with Machinery Directive 2006/42/EC, a risk analysis must be performed and the door system 

identified in accordance with CE Marking Directive 93/68/EEC before the door system is commissioned.

 

à

Observe the latest versions of directives, standards and country-specific regulations, in particular:

 

à

DIN 18650: 2010-06 “Building hardware– Powered pedestrian doors”

 

à

VDE 0100, Part 610: 2004-04 "Installing Electrical Power Systems with Nominal Voltages up to 1000 V"

 

à

DIN EN 16005: 2013-01 "Power operated pedestrian doorsets; safety in use; Requirements and test methods"

 

à

DIN EN 60335-1: 2012-10 “Safety of electrical devices for home use and similar purposes - Part 1: General 

requirements (IEC 60335-1: 2010, modified), German version EN 60335-1: 2012

 

à

DIN EN 60335-2-103: 2016-05 “Safety of electrical devices for home use and similar purposes - Part 2-103: 

Special requirements for drives for gates, doors and windows. (IEC 60335-2-103: 2006, mo A1: 2010, 

modified), German version EN 60335-2-103: 2015

Summary of Contents for Powerdrive PL-HT

Page 1: ...Powerdrive PL HT KIT EN Pre installation instructions VP 190485 00 ...

Page 2: ...6 4 3 Torques 6 4 4 Components and assembly groups 7 4 5 Bill of material VP Kit Powerdrive PL HT 7 5 Pre installation 8 5 1 Cutting the track to size 8 5 2 Preparing the track 8 5 3 Installing stop buffers 9 5 4 Connecting the contact on the toothed belt lock optional 9 5 5 Installing the drive components 10 5 6 Connecting transformer and control unit 11 5 7 Connecting drive motor and control uni...

Page 3: ...for an action This means you have to do something X X If there are several actions to be taken keep to the given order 1 2 Revisions and validity Version 00 valid for PL HT Kit from date of manufacture 2019 1 3 Product liability In compliance with the liability of the manufacturer for his products as defined in the German Product Liability Act compliance with the information contained in this broc...

Page 4: ...rect maintenance have taken place à à The relevant accident prevention regulations and other generally recognised safety related or health safety rules must be kept à à Only original accessories original spare parts and accessories approved by GEZE guarantee problem free function of the door system à à The mandatory installation maintenance and repair work must be performed by properly trained per...

Page 5: ...en when discon nected from the mains à à Always use insulated wire end ferrules for wire cores à à Danger of injury with opened drive Hair clothing cables etc can be drawn in by rotating parts à à Danger of injury caused by unsecured crushing impact drawing in or shearing spots à à Danger of injury due to sharp edges on the drive à à Danger of injury during installation through freely moving parts...

Page 6: ...2 0235 Component drawing Suspension profile leaf PL HT 70722 2 0253 Component drawing Suspension profile leaf HPL WOOD PL HT 70722 2 0237 Production drawing Frame right with floor guide 70722 2 0238 Production drawing Frame left with floor guide 70723 2 0239 Production drawing Floor guide profile right 707023 2 0240 Production drawing Floor guide profile left 707023 2 0250 Production drawing Carri...

Page 7: ... slide to open 1 leaf left hand slide to open 4 5 Bill of material VP Kit Powerdrive PL HT 1 Transformer earthing 2 Transformer 3 Toothed belt 4 Cable holder 5 Control unit 6 Rechargeable battery 7 Gear motor 8 Track 9 Stop buffer 10 Ramp 11 Guide roller 12 Transformer cable 13 Driver 14 Return pulley Div clear adhesive labels Accessories attachment drive compo nents Accessories for cable fastenin...

Page 8: ...track Pos 8 in the assembly group list Chapter 4 5 to the required length see processing drawings Chapter 4 1 X X Check whether additional bore holes are necessary see production drawing for track made to measure Chapter 4 1 X X Clean the track after processing 5 2 Preparing the track X X Push sliding blocks 4 and earth connectors 3 into the mounting groove in accordance with the drive diagram X X...

Page 9: ...lightly 5 4 Connecting the contact on the toothed belt lock optional X X Only insert the locking pin 1 in again after the cover has been set in place X X Place the alarm contact switch 3 on the feed back switch 2 X X Fix both switches in place on the locking mechanism using M2 3 x 18 4 screw and spring washer X X Connect cable X X Shorten the switching flag of the alarm contact switch ...

Page 10: ...065 mm Legend AL Length of drive L Running track length ÖW Opening width LR Ramp length AR Ramp gap FB Leaf width FH Leaf height Z Length of toothed belt Vrs Extension left Vls Extension right When the drive is extended Vls Vrs the positions of the components must be adapted accordingly X X Install the components with the screws provided in accordance with the drawing à à Torque for components whi...

Page 11: ...nsformer to the control unit 3 to size X X Fit wire end ferrules to the transformer cable 1 X X Note earthing connection X X Do not mix up wires X X If necessary shorten and strip cable 1 attach insulated wire end ferrules and connect to the connector 2 see wiring diagram X X Connect the connector 2 to the control unit 3 5 7 Connecting drive motor and control unit X X Route the rotary transducer c...

Page 12: ... Lay cable to the locking mechanism shorten if necessary strip and attach insulated wire end ferrules X X Connect cable to locking mechanism 2 see wiring diagram X X Place cover 3 on control unit and lock in place The retention force of the cover can be increased by slightly bending the cover X X When positioning the cover do not trap any cables ...

Page 13: ...d in the door leaves can move unexpectedly X X Make sure that the rechargeable battery cable is not plugged into the control unit The rechargeable battery is not connected to the control until the production test Chapter 5 12 or during com missioning X X Check whether the rechargeable battery cable 1 is long enough X X If necessary plug the rechargeable battery extension cable to the rechargeable ...

Page 14: ...ng X X Slide the earthing rail 1 to its final position X X Tighten 2 Allen screws 2 torque 5 Nm X X Connect the earthing cable 3 from the trans former to the device flat plug 4 5 11 Testing cover earthing on site X X Make sure that there is a cover earthing on the cover on site ...

Page 15: ...ian X X Carry out mains connection and earth conductor test in accordance with VDE 0100 Part 610 X X Carry out the production test as described in the wiring diagram Automatic sliding doors DCU1 NT DCU1 2M NT 5 13 Unplugging the cables X X Unplug the rechargeable battery cable transformer cable 1 Chapter 5 6 and locking cable optional 1 Chapter 5 8 on the control unit X X Wind up the cables and fi...

Page 16: ...ance fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office india geze com www geze in Italy GEZE Italia S r l E Mail italia it geze com www geze it GEZE Engineering Roma S r l E Mail italia it geze com www geze it Korea GEZE Korea Ltd E Mail info kr geze com...

Reviews: