background image

ECdrive H 

4

Fundamental safety notes

Fundamental safety notes

GEZE GmbH is referred to as GEZE below.

2.1  Intended use

The sliding door system is used for the automatic opening and closing of a building passage. 

The sliding door system may only be used in a vertical installation position and in dry rooms within the permitted 

application area.

The sliding door system is designed for pedestrian traffic in buildings. 

The sliding door system is not designed for the following uses:

 

à

for industrial use

 

à

for area of application which do not serve pedestrian traffic (such as garage doors)

 

à

on mobile objects such as ships

The sliding door system may only be used:

 

à

in the modes of operation provided for by GEZE

 

à

with the components approved/released by GEZE

 

à

with the software delivered by GEZE

 

à

in the installation variants / types of installation documented by GEZE

 

à

within the tested/approved area of application (climate / temperature / IP rating)

Any other use is considered non-intended and will lead to the exclusion of all liability and warranty claims to GEZE.

2.2  Safety notes

 

à

Intervention and modifications which influence the safety technology and functionality of the sliding door 

system may only be carried out by GEZE.

 

à

Problem-free and safe operation assumes proper transportation, proper set-up and installation, qualified 

operation and correct maintenance have taken place.

 

à

The relevant accident prevention regulations and other generally recognised safety technology or health & 

safety rules must be kept.

 

à

Only original accessories, original spare parts and accessories approved by GEZE guarantee problem-free 

function of the sliding door system

 

à

The mandatory installation, maintenance and repair work must be performed by properly trained personnel 

authorised by GEZE.

 

à

The country-specific laws and regulations are to be observed during safety-related tests.

 

à

If unauthorised changes are made to the system, GEZE cannot be held liable in any way whatsoever for any 

resulting damage, and the statement of approval for use in escape and rescue routes is no longer valid.

 

à

GEZE does not accept any warranty for combinations with third-party products.

 

à

Only original GEZE parts may be used for repair and maintenance work.

 

à

The connection to the mains voltage must be completed by an electrician or specialised electrical technician. 

Perform the power connection and protective earth connection test in accordance with VDE 0100 Part 600.

 

à

Use an on-site 10-A overload cut-out as the line-side disconnecting device.

 

à

Protect the display programme switch against unauthorised access.

 

à

In compliance with Machinery Directive 2006/42/EC, a risk analysis must be performed and the door system 

identified in accordance with CE Marking Directive 93/68/EEC before the door system is commissioned.

 

à

Observe the latest versions of guidelines, standards and country-specific regulations, in particular:

 

à

DIN 18650: “Building hardware – Powered automatic doors”

 

à

VDE 0100, Part 600: “Installation of low-voltage systems”

 

à

EN 16005: “Power-operated pedestrian doorsets – Safety in use– Requirements and test methods”

 

à

EN 60335-1: “Household and similar electrical appliances - Safety Part 1: General requirements” 

 

à

EN 60335-2-103: “Household and similar electrical appliances - Safety: Special requirements for drives for 

gates, doors and windows” 

 

à

Do not loosen screw-fitted electrical ground connections.

The product should be installed or incorporated in such a way that effortless access to the product is guaranteed 

during any repairs and/or maintenance, and that any removal costs do not stand out of proportion to the value 

of the product.

Summary of Contents for ECdrive H

Page 1: ...ECdrive H EN Pre installation instructions 190486 01...

Page 2: ...Diagrams 6 4 2 Tools and aids 6 4 3 Torques 6 4 4 Components and assembly groups 7 4 5 Bill of material VP Kit ECdrive H 7 5 Pre mounting 8 5 1 Machining the track and cover 8 5 2 Preparing the track...

Page 3: ...age to understand or optimise the operation sequences means additional Information X X Symbol for an action This means you have to do something X X If there are several actions to be taken keep to the...

Page 4: ...pair work must be performed by properly trained personnel authorised by GEZE The country specific laws and regulations are to be observed during safety related tests If unauthorised changes are made t...

Page 5: ...d crushing impact drawing in or shearing spots Risk of injury due to sharp edges on the drive and door leaf Risk of injury during installation through freely moving parts 2 4 Environmentally conscious...

Page 6: ...17 2 0229 Component drawing Leaf spring for cover ECdrive H The diagrams are subject to change without notice Use only the most recent version 4 2 Tools and aids Tool Closer size Tape measure Marking...

Page 7: ...ll of material VP Kit ECdrive H 1 Side plate 2 Transformer ground 3 Transformer 4 Transformer cable 5 Deflection pulley 6 Cable guide 7 Tooth belt 8 Control unit 9 Rechargeable battery 10 Motor gear u...

Page 8: ...over X X Check profiles for damage X X Cut the track and cover to the required length see machining drawings Chapter 4 1 X X Install the line feed 1 and drill holes 2 according to the drawing X X Clea...

Page 9: ...tion of the stop buffers 1 is specified during door leaf installation 5 4 Installing the drive components The exact positioning of the components is given on the drive drawings Illustrated 1 leaf W 70...

Page 10: ...there are no cables near the moving parts Cable guide spacing approx 200 mm X X Fix the cable guide 1 on the track 5 6 Connecting motor gear unit and control unit 3 1 2 X X Route the rotary encoder ca...

Page 11: ...e wire transformer cable 1 to length X X Strip both ends and attach insulated wire end ferrules X X Attach the two plugs 3 to the control unit 2 X X Plug the connector 3 into the control unit 2 3 1 2...

Page 12: ...ing the transformer ground WARNING The track is not earthed if there is a poor connection between earthing jumper 2 and track X X Check whether the setscrews of the earthing jumper 2 penetrate the ano...

Page 13: ...there are no blank points available for the device safety test X X Screw the cable shoe of the cover earthing cable 1 using a countersunk screw 4 serrated washer 3 and hexagon nut 2 X X Connect the e...

Page 14: ...y due to impact and crushing When the rechargeable battery cable 1 is plugged in the pulley on the motor gear unit may move suddenly X X Do not reach into the area of moving parts X X Check whether th...

Page 15: ...s cable and the metal part contacted with the probe is tested in each case Use the probe to contact at least the following test points Transformer metal bracket PE connection on the secondary side of...

Page 16: ...nce fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office...

Reviews: