Fundamental safety precautions

Fundamental safety precautions

 

X

Please also note the fundamental safety precautions in the installation instructions for the ECdrive H sliding 

door system.

2.1  Intended use

The ECdrive H sliding door system is suitable for the construction of an automatic sliding door system that is 

designed for use on the interior, in the medical field and in areas with high hygienic requirements. 

The completely assembled and tested ECdrive H drive unit must be assembled and put into operation in accord-

ance with the pre-installation instructions for the ECdrive H sliding door system.

The sliding door system is used for the automatic opening and closing of a building passage. 

The sliding door system may only be used in a vertical installation position and in dry rooms within the permit-

ted application area (see installation and service instructions).

The sliding door system is designed for pedestrian traffic in buildings. 

The sliding door system is not designed for the following uses:

 

à

for industrial use

 

à

for areas of application which do not serve pedestrian traffic (such as garage doors)

 

à

on mobile objects such as ships

The sliding door system may only be used:

 

à

in the modes of operation provided for by GEZE

 

à

with the components approved / released by GEZE

 

à

with the software delivered by GEZE

 

à

in the installation variants / types of installation documented by GEZE

 

à

within the tested/approved area of application (climate / temperature / IP rating)

Any other use is considered non-intended and will lead to the exclusion of all liability and warranty claims to GEZE. 

2.2  Safety notices

 

à

Intervention and modifications which influence the safety technology and functionality of the door system 

may only be carried out by GEZE. 

 

à

Problem-free and safe operation assumes proper transportation, proper set-up and installation, qualified 

operation and correct maintenance have taken place.

 

à

The relevant accident prevention regulations and other generally recognised safety-related or health & safety 

rules must be kept. 

 

à

Only original accessories, original spare parts and accessories approved by GEZE guarantee problem-free 

function of the door system.

 

à

The country-specific laws and regulations are to be observed during safety-related tests.

 

à

GEZE is not liable for any injuries or damage whatsoever resulting from unauthorised changes to the system.

 

à

GEZE does not accept any warranty for combinations with third-party products.

 

à

Furthermore, only original GEZE parts may be used for repair and maintenance work.

 

à

The connection to the mains voltage must be made by a professional electrician. Perform the power connec-

tion and equipment earth conductor test in accordance with VDE 0100 Part 610.

 

à

Use an on-site 10-A overload cut-out as the line-side disconnecting device.

 

à

Protect the display programme switch against unauthorised access.

 

à

In compliance with Machinery Directive 2006/42/EC, a risk analysis must be performed and the door system 

identified in accordance with CE Marking Directive 93/68/EEC before the door system is commissioned.

 

à

Observe the latest versions of directives, standards and country-specific regulations, in particular:

 

à

DIN 18650: 2010-06 “Building hardware– Powered pedestrian doors”

 

à

VDE 0100, Part 610: 2004-04 "Installing Electrical Power Systems with Nominal Voltages up to 1000 V"

 

à

DIN EN 16005: 2013-01 "Power operated pedestrian doorsets; safety in use; Requirements and test methods"

 

à

DIN EN 60335-1: 2012-10 “Safety of electrical devices for home use and similar purposes - Part 1: General 

requirements (IEC 60335-1: 2010, modified), German version EN 60335-1: 2012

 

à

DIN EN 60335-2-103: 2016-05 “Safety of electrical devices for home use and similar purposes - Part 2-103: 

Special requirements for drives for gates, doors and windows. (IEC 60335-2-103: 2006, mo A1: 2010, 

modified), German version EN 60335-2-103: 2015

Summary of Contents for EC drive H KIT VP

Page 1: ...EC drive H KIT EN Pre installation instructions VP 190486 00...

Page 2: ...4 2 Tools and aids 6 4 3 Torques 6 4 4 Components and assembly groups 7 4 5 Bill of material VP Kit ECdrive H 7 5 Pre installation 8 5 1 Cutting the track and cover to size 8 5 2 Preparing the track 8...

Page 3: ...s additional Information X X Symbol for an action This means you have to do something X X If there are several actions to be taken keep to the given order 1 2 Revisions and validity Version 00 valid f...

Page 4: ...tation proper set up and installation qualified operation and correct maintenance have taken place The relevant accident prevention regulations and other generally recognised safety related or health...

Page 5: ...even when discon nected from the mains Always use insulated wire end ferrules for wire cores Danger of injury with opened drive Hair clothing cables etc can be drawn in by rotating parts Danger of inj...

Page 6: ...Option Component drawing Side plate right left for ECdrive H 70517 2 0229 Option Component drawing Leaf spring for cover ECdrive H The diagrams are subject to change without notice Use only the most...

Page 7: ...to open 4 5 Bill of material VP Kit ECdrive H 1 Side plate 2 Transformer earthing 3 Transformer 4 Transformer cable 5 Return pulley 6 Cable holder 7 Toothed belt 8 Control 9 Rechargeable battery 10 G...

Page 8: ...Track Pos 14 in assembly group list Chapter 4 4 Cover Pos 11 in assembly group list Chapter 4 4 X X Check profiles for damage X X Cut the track and cover to the required length see machining drawings...

Page 9: ...ntil they are in contact with the track Do not tighten the setscrews The exact position of the stop buffers 1 is speci fied during door leaf installation 5 3 1 Installing the side plates X X Screw the...

Page 10: ...drive drawings Illustrated 1 leaf W 700 mm AL Illustrated 2 leaf W 900 mm AL Legend AL Length of drive W Opening width UM Return pulley motor UR Return pulley X X Install the components with the scre...

Page 11: ...anger of injury due to impact and crushing When the rechargeable battery cable is plugged in the door leaves can move unexpectedly X X Make sure that the rechargeable battery cable is not plugged into...

Page 12: ...cured in such a way that they do not become jammed when the cover is positioned and cannot come into contact with moving components X X Cut the transformer cable 1 from the trans former to the control...

Page 13: ...the control unit through the cable holders 4 and 5 to the transformer X X Fit the transformer cable 1 to the terminal 6 of the transformer 6 1 X X Set cover on control unit and lock in place The reten...

Page 14: ...X X The electrical system 230 115 V may only be connected and disconnected by a professional electrician X X Carry out mains connection and earth conductor test in accordance with VDE 0100 Part 610 X...

Page 15: ...nstallation the drive unit is prepared for later installation The current drive drawing is applicable for carrying out the installation work All components must be identified and installed in accordan...

Page 16: ...nce fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office...

Reviews: