ECdrive H KIT
2
Contents
1 Introduction...............................................................................................................................................................3
1.1
Symbols and illustrations ..............................................................................................................................................................................3
1.2
Revisions and validity .....................................................................................................................................................................................3
1.3
Product liability .................................................................................................................................................................................................3
1.4
Reference documents .....................................................................................................................................................................................3
Fundamental safety precautions .......................................................................................................................4
2.1
Intended use.......................................................................................................................................................................................................4
2.2
Safety notices .....................................................................................................................................................................................................4
2.3
Safety-conscious working .............................................................................................................................................................................5
2.4
Environmentally conscious working .........................................................................................................................................................5
2.5
Safety instructions related to transportation and storage ...............................................................................................................5
2.6 Qualification .......................................................................................................................................................................................................5
3
About this document .............................................................................................................................................6
4 Overview.....................................................................................................................................................................6
4.1 Diagrams ..............................................................................................................................................................................................................64.2
Tools and aids .....................................................................................................................................................................................................6
4.3 Torques .................................................................................................................................................................................................................64.4
Components and assembly groups ...........................................................................................................................................................7
4.5
Bill of material VP-Kit ECdrive H ..................................................................................................................................................................7
5 Pre-installation .........................................................................................................................................................8
5.1
Cutting the track and cover to size ............................................................................................................................................................8
5.2
Preparing the track ..........................................................................................................................................................................................8
5.3
Installing stop buffers .....................................................................................................................................................................................9
5.4
Installing the drive components .............................................................................................................................................................. 10
5.5
Connecting drive motor and control unit .............................................................................................................................................11
5.6
Checking the connection between rechargeable battery and control unit ............................................................................11
5.7
Installing cable holders ................................................................................................................................................................................12
5.8
Connecting transformer and control unit .............................................................................................................................................12
5.9
Mounting the transformer earthing ........................................................................................................................................................14
5.10
Production test ................................................................................................................................................................................................14
5.11
Unplugging the cables .................................................................................................................................................................................14
6
Preparation for installation .................................................................................................................................15
6.1
Fitting the cover earthing............................................................................................................................................................................15
Page 1: ...EC drive H KIT EN Pre installation instructions VP 190486 00...
Page 2: ...4 2 Tools and aids 6 4 3 Torques 6 4 4 Components and assembly groups 7 4 5 Bill of material VP Kit ECdrive H 7 5 Pre installation 8 5 1 Cutting the track and cover to size 8 5 2 Preparing the track 8...
Page 3: ...s additional Information X X Symbol for an action This means you have to do something X X If there are several actions to be taken keep to the given order 1 2 Revisions and validity Version 00 valid f...
Page 4: ...tation proper set up and installation qualified operation and correct maintenance have taken place The relevant accident prevention regulations and other generally recognised safety related or health...
Page 5: ...even when discon nected from the mains Always use insulated wire end ferrules for wire cores Danger of injury with opened drive Hair clothing cables etc can be drawn in by rotating parts Danger of inj...
Page 6: ...Option Component drawing Side plate right left for ECdrive H 70517 2 0229 Option Component drawing Leaf spring for cover ECdrive H The diagrams are subject to change without notice Use only the most...
Page 7: ...to open 4 5 Bill of material VP Kit ECdrive H 1 Side plate 2 Transformer earthing 3 Transformer 4 Transformer cable 5 Return pulley 6 Cable holder 7 Toothed belt 8 Control 9 Rechargeable battery 10 G...
Page 8: ...Track Pos 14 in assembly group list Chapter 4 4 Cover Pos 11 in assembly group list Chapter 4 4 X X Check profiles for damage X X Cut the track and cover to the required length see machining drawings...
Page 9: ...ntil they are in contact with the track Do not tighten the setscrews The exact position of the stop buffers 1 is speci fied during door leaf installation 5 3 1 Installing the side plates X X Screw the...
Page 10: ...drive drawings Illustrated 1 leaf W 700 mm AL Illustrated 2 leaf W 900 mm AL Legend AL Length of drive W Opening width UM Return pulley motor UR Return pulley X X Install the components with the scre...
Page 11: ...anger of injury due to impact and crushing When the rechargeable battery cable is plugged in the door leaves can move unexpectedly X X Make sure that the rechargeable battery cable is not plugged into...
Page 12: ...cured in such a way that they do not become jammed when the cover is positioned and cannot come into contact with moving components X X Cut the transformer cable 1 from the trans former to the control...
Page 13: ...the control unit through the cable holders 4 and 5 to the transformer X X Fit the transformer cable 1 to the terminal 6 of the transformer 6 1 X X Set cover on control unit and lock in place The reten...
Page 14: ...X X The electrical system 230 115 V may only be connected and disconnected by a professional electrician X X Carry out mains connection and earth conductor test in accordance with VDE 0100 Part 610 X...
Page 15: ...nstallation the drive unit is prepared for later installation The current drive drawing is applicable for carrying out the installation work All components must be identified and installed in accordan...
Page 16: ...nce fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info es geze com www geze es India GEZE India Private Ltd E Mail office...