Geotech 28738 User Manual Download Page 1

GEOTECH PVT REMOTE GATEWAY Manual

2015-11-30

USERS MANUAL

GEOTECH PVT

REMOTE GATEWAY

Ingenjörsfirman Geotech AB
Datavägen 53
SE-436 32 ASKIM (Göteborg)
Sweden
Ph: +46 - 31 28 99 20
Fax:+46 -31 68 16 39

E-mail: [email protected]
www.geotech.eu

Published date: 2015-11-30

Summary of Contents for 28738

Page 1: ...nual 2015 11 30 USERS MANUAL GEOTECH PVT REMOTE GATEWAY Ingenj rsfirman Geotech AB Datav gen 53 SE 436 32 ASKIM G teborg Sweden Ph 46 31 28 99 20 Fax 46 31 68 16 39 E mail info geotech se www geotech...

Page 2: ...GEOTECH PVT REMOTE GATEWAY Manual 2015 11 30...

Page 3: ...ion 8 2 6 3 Installation 8 Required equipment 8 3 1 Preparations 8 3 2 Installation 10 3 3 4 Maintenance 10 Charging of batteries 10 4 1 Authorized Workshops 11 4 2 Trouble Shooting 11 4 3 Appendix 1...

Page 4: ......

Page 5: ...is of information that was available at the time that the publication was written The information can change at any time Ingenj rsfirman Geotech AB reserves the right to change or update the content o...

Page 6: ...me between visits The built in battery can easily be exchanged upon visit or charged on site from via the separate USB charger The unit can optionally be equipped with a photovoltaic solar panel The g...

Page 7: ...llu lar phone network Sub scription and SIM card to be provided locally by the customer mini SIM 25 x 15 mm Dimensions 180 x 255 x 110 mm Weight 2 2 kg included in 28738 PVT Gateway setup soft ware So...

Page 8: ...prior notice 28776 PVT Gateway solar panel Photovoltaic solar panel for charging Gateway batter ies Design may change without prior notice Spare parts 28746 PVT Gateway battery Rechargeable battery fo...

Page 9: ...rom factory Specify length upon order ing 10663 Special cable PVT Double insulated copper cable Permanently mount ed on piezometer from factory Specify length up on ordering On request Direct push pie...

Page 10: ...e reduced if used in very cold environment If you need longer time between visits or more fre quent loggings updates we suggest installation of the optional photovoltaic solar panel Fig 3 PVT Remote G...

Page 11: ...m Ion Battery Please read safety instructions Battery capacity 6 months use with 4 piezometers connected time between loggings 1 hour time between sending log files to the serv er 24 hours Capacity co...

Page 12: ...y Medium size screw driver slot Small screw driver slot Pliers for cutting and stripping wire USB cable Portable computer with installed PVT Gateway setup software SIM card and information from your s...

Page 13: ...ation about PIN code APN code etcetera connected to your subscription Close the small box and connect the battery Remove the protection lid from the micro USB outlet and connect your computer with ins...

Page 14: ...a spare battery Charge the battery for 12 hours using the PVT Gate way battery charger The gateway will keep its settings for a few seconds If settings are lost by the gateway they will be restored u...

Page 15: ...ns please declare serial number of the Gateway if sending it for service Please refer transport instructions for Lithium Ion Batteries Never send damaged Lithium batteries by air Trouble Shooting 4 3...

Page 16: ...together with one spare battery Special rules apply when sending batteries alone without the equipment Do not send defect or damaged batteries by air Before sending the equipment please check applica...

Page 17: ...GEOTECH PVT REMOTE GATEWAY Manual 2015 11 30 13 Notes Notes...

Page 18: ...GEOTECH PVT REMOTE GATEWAY Manual 2015 11 30 2015 Ingenj rsfirman Geotech AB Datav gen 53 436 32 Askim SWEDEN Phone 4631289920 Fax 4631681639 www geotech eu info geotech se...

Reviews: