background image

 

31 

 

 

EC Declaration of Conformity 

 

Manufacturer:  

Geotech Environmental Equipment, Inc. 
2650 E 40th Avenue 
Denver, CO 80205 

 
Declares that the following products,  
 
Product Name:  

Geotech Portable Bladder Pump, CE 

 

 

 

Model(s):  

1

.66” Bladder Pumps 

 

 

.850” Bladder Pump 

 

 

.675” Bladder Pump 

 

 

 

 

 

Year of manufacture: 2010 

 

  

Conform to the protection requirements of 2006/42/EC Machinery Directive by application of the 
following standards:  

EN 809+A1/AC:2010 
EN 61010-1: 2010 
 
Year of affixation of the CE Marking: 2010 

 
 
Production control follows the ISO 9001:2008 regulations and includes required safety routine tests.  
 
This declaration issued under the sole responsibility of Geotech Environmental Equipment, Inc. 
 

 

Joe Leonard 
Product Development 
 
 
Serial number 

________________ 

 

Summary of Contents for 0.675

Page 1: ...Rev 05 25 2017 Part 11150323 Geotech Portable Bladder Pumps Installation and Operation Manual...

Page 2: ......

Page 3: ...4 Section 2 System Installation 6 Section 3 System Operation 8 Section 4 System Maintenance 13 Section 5 System Troubleshooting 20 Section 6 System Specifications 21 Section 7 Replacement Parts List 2...

Page 4: ...proceed until you read and thoroughly understand the WARNING message WARNING CAUTION A raised hand icon indicates CAUTION information that relates to a situation or condition that could lead to equip...

Page 5: ...ropriate gloves and be mindful of contaminated fluids contacting your person and entering the environment when operating any ground water sampling device WARNING The following applies only to users in...

Page 6: ...via hydrostatic pressure The pump must be submerged to operate The bladder then fills with fluid Compressed air enters the space between the bladder and the interior of the pump housing The intake che...

Page 7: ...Stainless Steel and is easily removable for field maintenance The intake filter screen protects and extends the life of the bladder material see Warranty Optional Drop Tube Intake Assembly An optiona...

Page 8: ...ecifications of this manual for tubing sizes When using the 1 66 4cm diameter pump the larger diameter tube is for fluid and the smaller one for air Read the following before installation to prevent d...

Page 9: ...in lowering the pump into the well especially when the well is not vertical or has come out of alignment for any reason Optional Drop Tube Assembly If a Drop Tube Intake assembly is employed a third t...

Page 10: ...ring pumping and start to increase after all of the water has been evacuated from the pump If you notice the pressure increasing after a pump cycle reduce DISHCARGE TIME Using the Example Flow Rates s...

Page 11: ...irline 150 ft 46 m airline 3 ft 0 9 m submergence Pump Size Discharge Tube Size Flow Approx Geocontrol PRO Settings Fill Time Discharge Time 1 66 x 36 4 x 91 cm 1 4 ID x 3 8 OD 64 x 127 mm 9 oz min 26...

Page 12: ...in 0 43 cm 0 3 in 5 cm 3 in 50 cm 15 in 246 cm 30 in 492 cm 75 in 1230 cm 150 in 2460 cm 0 25 in 0 64 cm 0 6 in 10 cm 6 in 100 cm 30 in 492 cm 60 in 984 cm 150 in 2460 cm 300 in 4920 cm Air Volume of...

Page 13: ...11 Figure 3 1 Tank Volume vs BP Consumption...

Page 14: ...s mentioned above the additional 10 PSI 0 7 bar is to account for the pump itself and friction loss along the airline tubing When the length of the airline is 50 15m or less there is no need for the a...

Page 15: ...by turning the housing counter clockwise Use your hand or a strap wrench If the pump does not easily come off use the wrench flats on the cap to provide leverage The housing should twist slide off DO...

Page 16: ...4 Pulling from the lower end of the bladder 18 21150054 36 21150141 slide the bladder off the internal center tube weldment assembly Figure 4 4 Removal of Bladder 5 Remove all O rings If needed use a...

Page 17: ...Check Ball from the inside of the Bottom Intake Assembly 3 Remove all O rings on the assembly If needed use a flat object to help the O rings out of the grooves on the Bottom Intake Assembly Do not ov...

Page 18: ...e Assembly 3 Insert the SS Check ball into the Bottom Intake Assembly 4 Push the Check Ball Retainer in ensuring the O ring is no longer visible Bladder Reassembly 1 Install O ring 11150318 on the cap...

Page 19: ...50054 36 21150141 onto the internal center tube weldment assembly over the O ring 11150319 on the bottom end of the center tube assembly and then over the O ring 11150319 on the upper end of the cente...

Page 20: ...he bladder secured by the Compression Ring 21150042 slide the second compression ring over the end of the bladder until the O ring is visible in the middle of the Compression Ring Figure 4 15 Bottom C...

Page 21: ...t into the bottom of the pump Be sure the bottom intake assembly is sealed against the outer housing Figure 4 17a Incorrect Installation Figure 4 17b Correct Installation Inspect O rings and bladder f...

Page 22: ...pecifics on dealing with this situation Problem Not pumping any fluid or no air Solutions Verify the pump is below static water level Inspect airline tubing for kinks cracks or breaks Make sure you ar...

Page 23: ...00 g 376 g Volume Cycle 11 oz 5 oz 1 oz 0 5 oz 310 mL 150 mL 29 mL 15 mL Min Well I D 2 2 1 75 50 mm 50 mm 25 mm 19 mm Min Operating Pressure 5 psi ash 3 bar Operating Pressure 100psi 7 bar Proof Pres...

Page 24: ...to 500 152m of water column Special care must be taken to avoid burns and exposure to out gassing of volatiles when pumping fluids at elevated temperatures Special air source considerations need to be...

Page 25: ...23 Section 7 Replacement Parts List 1 66 Bladder Pump Components 18 model shown...

Page 26: ...SFTY CB CE 51150068 10 1 CAP UPPER WELDMENT SS 1 66 18 PBP CE 21150091 10 CAP UPPER WELDMENT SS 1 66 36 PBP CE 21150136 11 1 PLUG BALL RETAINER 1 66 PBP CE 21150096 12 1 O RING VITON 014 17500119 13 1...

Page 27: ...25 Sold Separately 850 Bladder Pump Components...

Page 28: ...850 BP 21150047 10 1 ASSY BOTTOM INTAKE 85 BP 51150118 11 1 CAP LOWER SS6 850 BP 21150046 12 1 SCREEN INTAKE SS6 85 BP 21150050 13 1 DISC PTFE 85 BP 21150049 14 1 RING SNAP SS6 INTERNAL 85 BP 11150053...

Page 29: ...27 675 Bladder Pump Components...

Page 30: ...120 10 1 RETAINER BALL 675 BP TACO 21150087 11 1 BALL SS6 1 4 17500079 12 1 CAP LOWER SS6 675 BP 21150031 13 1 SCREEN INTAKE SS6 675 BP 11150317 14 1 DISC PTFE 675 BP 21150033 15 1 RING SNAP SS 675 BP...

Page 31: ...n flow rate examples SP 12 08 15 Corrected Drop Tube tubing size for 1 66 models SP 1 11 2016 Project 1482 Section 2 added note about 1 66x36 model requiring BP Controller 300 for full bladder volumes...

Page 32: ...30 Notes...

Page 33: ...f manufacture 2010 Conform to the protection requirements of 2006 42 EC Machinery Directive by application of the following standards EN 809 A1 AC 2010 EN 61010 1 2010 Year of affixation of the CE Mar...

Page 34: ...al Authorization number RMA is required prior to return of any equipment to our facilities please call our 800 number for appropriate location An RMA will be issued upon receipt of your request to ret...

Page 35: ...303 322 7242 email sales geotechenv com website www geotechenv com In the EU Geotech Equipos Ambientales Calle Francesc I Ferrer Guardia Local 19 Mollet del Valles Barcelona 08100 Espa a Tlf 34 93 54...

Reviews: