10
| NETWORK INSTALLATION | GEOKON
TO SET THE CHANNEL:
Move the channel select DIP switches (shown in the figure below) to any of the
twelve valid positions listed in Table 5 below. The setting will take effect at
power-up, or after the device is reset.
11:
FIGURE 11:
Channel Select Switches
TABLE 5:
Channel Selection
3.2
CONFIGURE THE SUPERVISOR
3.2.1 POWER CONCERNS
In a new network, be sure to power the Supervisor before powering the Nodes.
When the unit is powered an LED on the right side of the box will flash twice,
indicating the unit has power. (The LEDs will not flash again until at least one
Node has joined the Network.)
Note:
Deployment mode starts as soon as devices are powered on or reset. For
more information on Deployment mode, see Section 3.7.
Note:
If replacing batteries in an existing network, ensure that the network is in
deployment mode prior to removing the batteries. See Section 4.3 for more
information on battery replacement.
Modbus Address and Channel
5:
1
2
3
4
1
OFF
OFF
OFF
OFF
2
ON
OFF
OFF
OFF
3
OFF
ON
OFF
OFF
4
ON
ON
OFF
OFF
5
OFF
OFF
ON
OFF
6
ON
OFF
ON
OFF
7
OFF
ON
ON
OFF
8
ON
ON
ON
OFF
9
OFF
OFF
OFF
ON
10
ON
OFF
OFF
ON
11
OFF
ON
OFF
ON
12
ON
ON
OFF
ON
Summary of Contents for GeoNet 8900 Series
Page 2: ......
Page 4: ......
Page 12: ...VIII ...
Page 38: ...26 MODEL 8800 2 4B ADD ON MODULE GEOKON ...
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......