October 2018
Maintenance Manual
Commissioning Procedures
Part No. 1268489GT
S
®
Booms • Z
®
Booms
39
C-1
Perform 50 Hour Service
The 50 hour maintenance procedure is a one time
sequence of procedures to be performed after the
first 50 hours of usage. After this interval, refer to
the maintenance inspection report for continued
scheduled maintenance.
1 Perform the following maintenance
procedures:
All Models:
Q-6
Inspect the Tires, Wheels and Lug Nut
Torque
A-1
Grease the Turntable Rotation Bearing and
Rotate Gear
A-2
Check the Turntable Rotation Bearing
Bolts
A-5
Check the Jib Rotator Fastener Torque
(SX-150 and SX-180 models)
P1-2 Replace the Drive Hub Oil
P2-3 Replace the Hydraulic Filters
C-2
Perform Engine Maintenance - 50
Hours
The 50 hour maintenance procedure is a one time
sequence of procedures to be performed after the
first 50 hours of usage. After this interval, refer to
the maintenance inspection report for continued
scheduled maintenance.
Ford Models
•
Oil, coolant, fuel, exhaust and vacuum
hoses - check for leaks, damage or
deterioration
•
Electrical wiring - check for chafing or
damage
Kubota Models:
•
Engine oil - replace
•
Oil filter - replace
GM .998L
•
Cylinder head bolts - torque
(40.5 ft-lbs / 55 Nm)
•
Valve clearance - check/adjust
Perkins 404F-E22T, 404F-E22TA
•
Fan clearance - check
Required maintenance procedures and additional
engine information are available in the
manufacturer's manuals. Refer to Specifications,
Engine Operator and Maintenance Manuals
.
Summary of Contents for S Series
Page 182: ......