
GENERALTOUCH TECHNOLOGY CO., LTD
Issued by: Customer Service Department 20
/
22 Issued Date: 2013.10.14
发行部门:客户服务部
发行时间:
2013.10.14
the installation, about 1mm height space should be kept between the touch screen and the front
frame.
下面两张图是防尘硅胶条方案的原理图和放大图。这种方案通常应用在室内坏境,比如办公室,餐馆和
游戏场所。完成组装后,防尘泡棉的压缩量大约是防尘泡棉原始厚度的
30%
。下图所示的例子,防尘
泡棉的初始厚度为
1.5mm
,那么完成安装后,在前框和触摸屏之前的防尘泡棉应该保持大约
1mm
的厚
度。
(
Dust-proof sponge strip solution
,防尘泡棉条方案原理示意图)
(
Enlarged picture for dust-proof sponge strip solution
,防尘泡棉方案结构放大图)
After assembly, if you find any touch function problem which may be caused by improper assembly or any
other reasons, please feel free to contact our technical support by the contact information in the end of this
Installation Guide.
安装完成后,如果你发现因任何安装过程不合理的操作或其他原因导致触摸功能故障的问题,请根据安装指导最
后的联系信息联系我们的技术支持。
The END of the SOP!