
19
MAIN CONTROL PANEL
1.
MAIN CIRCUIT BREAKER:
This 240V (100A) breaker will disconnect power to the lights and receptacles.
2.
CIRCUIT BREAKER INDICATOR LIGHT:
This light indicates that the main circuit breaker must be opened
(switched off) before starting the engine.
3.
LIGHT SWITCHES:
One circuit breaker is supplied for each light.
4.
BALLAST INDICATOR LIGHTS:
Indicates power from the ballast to each light.
5.
ENGINE HOUR METER
: Keeps track of engine hours for service.
6.
CONTROL POWER SWITCH:
Keyed switch operates glow plugs and starts and stops engine.
7.
GLOW PLUG INDICATOR:
Indicates operation of the engine glow plugs.
PRESTART CHECKLIST
Before starting the unit, all items in the prestart checklist must be completed.
Read and understand
ALL
safety sections at the beginning of this manual.
Ensure all maintenance procedures are up to date. For more information, refer to
and Basic Maintenance Schedules beginning on
The unit must be level.
The unit must be dry. Check for any water inside, on, or near the unit; dry if needed.
Ensure the unit is properly grounded to a good earthen ground. Installation should be in compliance
with the National Electrical Code (NEC), state and local regulations.
Switch the Control Power switch to the OFF (O) position.
Switch all circuit breakers to the OFF (O) position.
NEUTRAL BONDED TO FRAME
BALLAST INDICATOR LIGHTS
MAST LIGHT SWITCHES
I
O
I
O
I
O
I
O
OFF
RUN
START
GLOW
PLUGS
TURN
MAIN
BREAKER
OFF
240VAC
MAIN CIRCUIT
BREAKER
0
0 0
0
0
HOURS
ON
ON
ON
ON
ON
ON
1
2
3
5
4
6
00168
GLOW PLUG
INDICATOR
7
Discount-Equipment.com