Following is a recommended maintenance schedule for Generac small standby and residential generator sets 
from 8 kW to 35 kW in size, and applies to both diesel engine and gas engine driven units. The established 
intervals in the schedule are the 

maximum

 recommended when the unit is used in an average service applica-

tion.  They will need to be decreased (performed more frequently) if the unit is used in a severe application. 
Use the unit hour meter or calendar time, whichever occurs first, from the previous maintenance interval to 
determine the next required maintenance interval.

service maintenance interval information:

The various service maintenance intervals are designated by interval numbers as follows:

1

   An early inspection of the generator set to insure it is ready to operate when required and to identify any 

potential problem areas.

   

Performed monthly or following each 10 hours of operation of the unit and requires approximately .

man-hours

 per unit to complete.

   This inspection may be performed by the end user providing the following safety steps are taken to prevent 

the engine from starting automatically without warning:

  To prevent injury, perform the following steps in the order indicated before starting any maintenance:
  • 

 Disable the generator set from starting and/or connecting to the load by setting the control panel  
Auto-Off-Manual switch to the “OFF” position.

  • 

Remove the control panel fuse.

  • 

Turn off the battery charger.

  • 

Remove the negative battery cable.

*

  The battery charger must be turned off Before removing the battery cable to prevent an over current 

condition from burning out sensitive control panel components and circuits.

   Following all maintenance, reverse these steps to insure the unit is returned to standby setup for normal  

operation when required.

2

   A break-in service inspection of the generator set to insure it is ready to operate and carry the load when 

required, and to identify any potential problem areas.

 

 Performed 

ONLY ONCE

 following the first three months or the first 30 hours of operation after purchase 

of the unit and requires approximately 

2.5 man-hours

 per unit to complete.

   This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 

to accomplish and should be performed only by an authorized Generac Service Dealer.

3

   An  operational  inspection  of  the  generator  set  to  insure  it  is  ready  to  operate  and  carry  the  load  when 

required, and to identify any potential problem areas.

 

 Performed semi-annually or following each 50 hours of operation of the unit and requires approximately 

1.5 man-hours

 per unit to complete.

   This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 

to accomplish and should be performed only by an authorized Generac Service Dealer.

4

   A mid-level inspection of the generator set to insure it is ready to operate and carry the load when required, 

and to identify any potential problem areas.

 

 Performed annually or following each 100 hours of operation of the unit and requires approximately 

4.0 

man-hours

 per unit to complete.

   This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 

to accomplish and should be performed only by an authorized Generac Service Dealer.

Summary of Contents for 4G64-D-Z8

Page 1: ...2 4 SERVICE MANUAL Manual Part No 0G2832 MITSUBISHI GAS ENGINE...

Page 2: ...advise the service trade of all conceivable procedures or methods by which a service might be performed nor of any possible hazards and or results of each procedure or method We have not undertaken an...

Page 3: ...r use in Generac Power Systems products The contents of this manual have been reprinted from the original manufacturer s service and repair manual service recommendations A_2 Mitsubishi Contents 2 4 L...

Page 4: ...e recommended cool ant mixture When adding coolant always add the recommended 50 50 mixture Coolant Capacity 1 80 U S gallons Do not remove the radiator pressure cap while the engine is hot or serious...

Page 5: ...r must be turned off BEFORE removing the battery cable to prevent an over current condition from burning out sensitive control panel components and circuits Following all maintenance reverse these ste...

Page 6: ...as delivery system on gas engine driven units Tighten connections as necessary 6 Check the diesel fuel supply level for diesel engine driven units Fill as necessary 7 Drain water and sedi ment from th...

Page 7: ...to site load and exercise it for at least 1 hour looking for leaks loose connections or components and abnormal operating conditions Correct as necessary 17 Start and exercise the unit at full rated l...

Page 8: ...Notes...

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ......

Page 38: ......

Page 39: ......

Page 40: ......

Page 41: ......

Page 42: ......

Page 43: ......

Page 44: ......

Page 45: ......

Page 46: ......

Page 47: ......

Page 48: ......

Page 49: ......

Page 50: ......

Page 51: ......

Page 52: ......

Page 53: ......

Page 54: ......

Page 55: ......

Page 56: ......

Page 57: ......

Page 58: ......

Page 59: ......

Page 60: ......

Page 61: ......

Page 62: ......

Page 63: ......

Page 64: ......

Page 65: ......

Page 66: ......

Page 67: ......

Page 68: ...P O BOX 310 EAGLE WI 53119 Part No 0G2832 Revision 07 14 06 Printed in U S A...

Reviews: