Rev. 00 08/17
MagicControl 4.0 (CM40)
Operation
29
Operation
Operation
During the initial commissioning of the device, the functional
check is to be performed without powder!
Starting the plant
1.
Turn the main switch to the
ON position
.
– The plant control starts the operating system, the PLC control
and the operating software to the start page.
Fig. 9: Start page
2.
Touch the screen
– The screen switches to the main page:
Summary of Contents for MagicControl 4.0
Page 6: ......
Page 24: ...Rev 00 08 17 24 Product description MagicControl 4 0 CM40 ...
Page 59: ...Rev 00 08 17 MagicControl 4 0 CM40 Operation 59 ...
Page 60: ...Rev 00 08 17 60 Operation MagicControl 4 0 CM40 ...
Page 74: ...Rev 00 08 17 74 Fault clearance MagicControl 4 0 CM40 ...
Page 82: ...Rev 00 ...