Rev. 01 08/20
46
Operation
OptiStar All-in-One (CG22-C)
Correction factor
– diagram
Impact of the powder hose correction
(powder hose 11 mm x 12 m)
Powder
ou
tp
ut [g/
m
in]
Powder setting [%]
fig. 13: Correction factor
– diagram
The hose length correction factor is chosen in such a way, that
no powder is visible, if the powder portion is 0%, by increasing
the value, the powder becomes visible then.
– This behavior depends on the hose length and the hose
diameter.
Daily correction value C2
The daily correction value C2 can be used to allow higher or lower
powder volumes!
Summary of Contents for CG22-C
Page 6: ......
Page 28: ...Rev 01 08 20 28 Assembly Connection OptiStar All in One CG22 C ...
Page 36: ...Rev 01 08 20 36 Start up OptiStar All in One CG22 C ...
Page 50: ...Rev 01 08 20 50 Operation OptiStar All in One CG22 C ...
Page 54: ...Rev 01 08 20 54 Maintenance Repairs OptiStar All in One CG22 C ...
Page 60: ...Rev 01 08 20 60 Disposal OptiStar All in One CG22 C ...
Page 65: ...Rev 01 08 20 OptiStar All in One CG22 C Spare parts list 65 Powder conveying unit fig 16 ...
Page 67: ...Rev 01 08 20 OptiStar All in One CG22 C Spare parts list 67 Valve block fig 17 ...
Page 69: ...Rev 01 08 20 OptiStar All in One CG22 C Spare parts list 69 Connecting material fig 18 ...
Page 70: ......
Page 72: ...Rev 01 08 20 72 Index OptiStar All in One CG22 C ...
Page 73: ......
Page 74: ...Rev 01 ...