![Geko 20010 ED-S/DEDA Operating Instructions Manual Download Page 63](http://html1.mh-extra.com/html/geko/20010-ed-s-deda/20010-ed-s-deda_operating-instructions-manual_2206055063.webp)
Safety Guidelines
11
0.3
Personnel selection and qualifications; main duties
Work on the machinery/equipment may only be performed by authorized person-
nel. The legally permissible minimum age must be observed!
Only skilled and trained personnel may be used for its operation, setup, mainte-
nance and repair!
Ensure that only authorized personnel work on the machine!
It is the operator’s responsibility – including with regard to transport regulations –
to accept and reject dangerous instructions from third parties!
Personnel being educated, schooled, instructed or in general training may only
work on the machinery/equipment under the constant supervision of an experi-
enced person!
Work on machinery/equipment electrical systems may only be performed by a
qualified electrician or by persons being trained under the direction and supervision
of a qualified electrician in accordance with electrical engineering regulations.
Work on gas equipment (gas appliances) may only be performed by personnel
trained for this.
Only personnel with special skills and experience in hydraulics may work on hy-
draulic devices!
0.4
Safety guidelines for operation
Refrain from any dangerous work methods!
Take steps to ensure that the machinery/equipment is only operated in safe and
proper working condition!
Operate the machinery only when all protective devices and safety-related equip-
ment such as releasable protective devices, emergency stop devices, sound insula-
tion and extractors, are present and functional!
At least once per shift the machinery/equipment should be checked for externally
visible damage and defects! Immediately inform the responsible agency/personnel
of any changes (including operating behaviour)! If possible, immediately shut the
machinery down and secure it!
In the case of malfunctions, immediately shut the machinery/equipment down and
secure it! Fix malfunctions immediately!
Observe on and off procedures and control displays in accordance with operating
instructions!
Before turning on/starting the machinery/equipment, ensure that nobody may be
endangered by the running machinery/equipment!
The generator switch must be in the „OFF“ position upon start-up of the power set.
Do not shut off or remove suction and ventilation devices when the machine is
running!
Summary of Contents for 20010 ED-S/DEDA
Page 2: ......
Page 4: ...2...
Page 17: ...Beschreibung 15 1 BESCHREIBUNG 1 1 Abmessungen 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 18: ...Beschreibung 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 52: ......
Page 54: ...2...
Page 67: ...Depiction 15 1 DEPICTION 1 1 Dimensions 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 68: ...Depiction 16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 102: ......
Page 104: ...2...
Page 105: ...3 GEKO...
Page 106: ...4 GEKO...
Page 107: ...5 GEKO...
Page 111: ...9 0 0 1 0 2...
Page 112: ...10...
Page 113: ...11 0 3 0 4 OFF...
Page 114: ...12 0 5 OFF...
Page 115: ...13 0 6 0 6 1...
Page 116: ...14 0 6 2 0 6 3 0 6 4 0 6 5 0 6 6...
Page 117: ...15 1 1 1 1 1 1 20010 ED S DEDA 30010 ED S DEDA...
Page 118: ...16 1 1 2 20010 ED S DEDA SS 30010 ED S DEDA SS...
Page 120: ...18 18 1 18 2 18 3 18 4 18 5 18 1 18 2 18 5 18 4 18 3 18 5...
Page 124: ...22 1 8 GEKO 400 230 50 2 3 1 9 1 9 1 17 7 1 9 2 17 8 1 9 3 17 4...
Page 127: ...25 1 11 2 DHD 1 ACEA E7 04 E3 96 E5 02 E4 07 E6 04 API CG 4 CH 4 CI 4 CI 4 Plus CJ 4 SAE...
Page 129: ...27 1 14 Zanardi ATEB 28 IEC 34 1 50 60 1 14 1 ATE 12...
Page 131: ...29 2 2 1 1 10 2 2...
Page 132: ...30 2 3 A B 0 5 C 1 0...
Page 133: ...31 2 4 2 5 2 5 7 2 5 4 5 1 5 2 2 4 1 10 2 5 2 5 7 5 10 200...
Page 134: ...32 2 5 2 5 1 2 5 2 5 MAX MIN MIN...
Page 135: ...33 2 5 3 START 20 9 19 10 2 5 4 1 11 17 12 2 5 2...
Page 136: ...34 2 5 5 2 5 6 GEKO DIN VDE 0100 551 DIN VDE 0100 410 16 14 BGV A3 TN C S...
Page 138: ...36 3 3 2 5 3 2 5 2 3 4 STOP 20 11 BLC 200 OFF 20 6 3 5 19 16 OFF 20 6...
Page 139: ...37 3 6 STOP 20 11 BLC 200 OFF 20 6 3 7 1 11 1 SAE 2 0 C 3 15 C 3 9 3 8 GEKO...
Page 141: ...39 4 500...
Page 143: ...41 5 1 17 11 21 2 21 3 21 3 5 2 5 2 21 2 21 1 21 2 5 3 17 5 6 1 2...
Page 144: ...42 5 4 5 5 500 17 10 80 C 17 10 5 7 1 11 2 5 2...
Page 145: ...43 5 6 3 4 1...
Page 146: ...44 5 7 17 9 1 10 5 MAX MIN 5 8 17 11 21 3 21 2 5 2 5 9 5 2...
Page 147: ...45 5 10 5 10 1 15 Deutz 1 3 2 4 2 1 5 1 Deutz 5 10 2 1 2 3 4 3 1 2 3...
Page 148: ...46 5 10 3 1 2 3 4 3 4 3 1 2 3 5 11 1 2 3 3 5 5 12 1...
Page 149: ...47 6 6 1 6 2 6 3 6 4...
Page 150: ...48 6 5 LDA SAE LDA...
Page 151: ...49 6 6 240 40 C...