![Gehl R105 (EU) Operator'S Manual Download Page 68](http://html1.mh-extra.com/html/gehl/r105-eu/r105-eu_operators-manual_2205885068.webp)
64
50950260/AP1216
Adjustments
Control Handles
The control handles do not require routine adjustment. Refer to the
Service
Manual
for the initial setup procedure.
Fuel Sender
The fuel sender, located in the fuel tank, sends a signal to the fuel gauge indi-
cating the amount of fuel left in the fuel tank.
Check the fuel sender periodically to ensure that the mounting screws are tight
and that there is no fuel seepage around the gasket. If replacement is required,
apply an RTV or gasket sealant around the gasket when restoring the fuel sender.
Drive Chains
The drive chains do not require routine adjustment. Refer to the
Service Manual
for the initial setup procedure.
Removing Foreign Material
The loader should be cleared daily of dirt and other foreign materials in the fol-
lowing areas:
• around the lift cylinders
• at the front of the loader
• on the hitch, especially around tilt cylinder
• around the hydraulic oil reservoir breather
• in the engine compartment
• in the operator’s compartment
Important:
Build-up of foreign materials in these areas can interfere with the
operation of the loader, cause component damage or become a fire hazard.
Summary of Contents for R105 (EU)
Page 64: ...60 50950260 AP1216 Notes...
Page 78: ...74 50950260 AP1216 Engine Diagnostic Chart DPF Models...
Page 79: ...50950260 AP1216 75 Engine Diagnostic Chart DPF Models cont...
Page 80: ...76 50950260 AP1216 Engine Diagnostic Chart DPF Models cont...
Page 81: ...50950260 AP1216 77 Engine Diagnostic Chart DPF Models end...
Page 102: ...98 50950260 AP1216 Maintenance Log Date Hours Service Procedure...
Page 103: ...50950260 AP1216 99 Maintenance Log Date Hours Service Procedure...
Page 104: ...100 50950260 AP1216 Maintenance Log Date Hours Service Procedure...
Page 116: ...112 50950260 AP1216 NOTES...