FE02-0425b
3.
Install the drive belt.
4.
Install the generator charging wiring harness and tighten
the harness retaining nut.
Torque: 10 Nm (Metric) 7.4 lb-ft (US English)
FE02-0426b
5.
Connect the generator harness connector.
6.
Connect the battery negative cable.
2.11.8.4 Starter Replacement
Removal Procedure:
Warning!
Refer to "Battery Disconnection Warning" in "Warnings
and Notices"
FE02-0427b
1.
Disconnect the battery negative cable. Refer to
.
2.
Disconnect starter control wiring harness connector.
Engine
Starting / Charging System JL4G18-D
2-581
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......