FE02-0285b
9.
Install the second air ring.
Note
The side with letters should face the top.
FE02-0286b
10. Install first gas ring.
Note
The chamfered side should face the top.
11. Apply the engine oil to the connecting rod bearings and
install the connecting rod journal and the bearing cap.
12. Install the connecting rod to the crankshaft. Check
whether the bearing clearance is acceptable. Refer to
Mechanical System Specification
Standard Value: 0.020-0.044 mm (Metric) 0.0007-0.0017
in (US English)
13. Install the piston rod components.
2.6.8.20 Valve Clearance Adjustments
FE02-0287b
1.
Remove the engine plastic shield. Refer to
2.
Remove the ignition coil. Refer to
3.
Remove the cylinder head cover. Refer to
4.
Remove the timing chain cover, rotate the crankshaft so
that cylinder No.1 is at TDC position. Refer to
Timing Chain Cover Replacement
5.
Check valve clearance. Use the plug gage to measure
valve clearance value, as arrows shown in the graphic and
record the valve location and tolerance that exceeds the
tolerance.
2-422
Engine Mechanical System JL4G18-D
Engine
EC718/EC718RV EC715/EC715RV 10/2009
Summary of Contents for EC715 2009
Page 4: ......
Page 330: ...Next Step 10 End 2 248 Fuel System JL4G18 D Engine EC718 EC718RV EC715 EC715RV 10 2009 ...
Page 1164: ......
Page 2008: ......