
GEEETECH
www.geeetech.com
Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 – 858
Page
74
ShenZhen GETECH CO.,LTD
4Connect wires for thermistor.
Step 1.
Connect the thermistor from to the heat-bed to the left connector plug.
Step 2.
Connect the thermistor from “hot end 1” to the right connector plug.
Step 3. Connect the thermistor from “hot end 2” to the middle connector plug.