
GEEETECH
www.geeetech.com
Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 – 858
Page
58
ShenZhen GETECH CO.,LTD
*Note.
The auto-leveling device is towards the X tower, as shown in the following
picture:
Fix the remaining diagonal rods (#4) to the carriages with a round head screw with
pad (#15).
9 Mount the extruder
We shall be using the dual extruder as the example in this assembly guide as most of
the steps are very similar to the single extruder model.