Tel: +86 755 2658 4110
Fax: +86 755 2658 4074 - 858
Shenzhen GETECH CO.,LTD
GEEETECH
Step2. Thread the threaded rods of Z axis through the brass nuts. It would be easier to
do it now. Keep both end of the X axis flush.
Step3. Put the assembled X-axis on the Z-axis. Then slide the smooth rod into the
linear bearings.