Tel: +86 755 2658 4110
Fax: +86 755 2658 4074 - 858
Shenzhen GETECH CO.,LTD
GEEETECH
NO.40
2
LM8UU linear bearing
Step1. Mount the print bracket on the smooth rods.
1) Insert the linear bearings into the slot of the bracket as you can see from the
picture.
2) Thread the zip-tie through the extruder bracket. Tie them up with zip ties.
The stretch-out part is towards the Left X-axis end.