GEDA
®
3700 Z/ZP
Assembly
ML034 GB 2017 / 11
Page 51 of 60
Assembly Instructions
Installing the central feeder
Make a loop in the centre of the travelling cable required for the
assembly (cable from the cable box + extension) and attach this to the
platform so that it is accessible.
Carefully move to half the final assembly height, or to the mast sections
already installed (maximum 100 m).
In order to prevent damage to the cable, one person guides the
halves of the cable from the ground.
Using the pipe clamps (5), install the central feeder (4) to the round
tubes of the mast.
Installing the travelling cable
Place the travelling
cable (1) over the
central feeder (4) and
attach by tapping in
the clamping
wedges (6).
Direction of cable:
A = Cable from the ground station
B = Cable to the cable carriage
Release the cover (7) of the cable roller and
fold up.
5
B
A
7
4
6
1