Assembly
GEDA
®
3700 Z/ZP
Assembly Instructions
Page 20 of 60
ML034 GB 2017 / 11
6.3
Operation for assembly
For installation, it is only possible to operate from the platform in dead
man’s control with two hands. The platform only moves for as long as the
operating buttons are pressed.
Loading doors, barriers with unloading ramp and assembly plank must be
closed and engaged. The assembly guard must be properly hung up.
The main switch (on the ground station switch box) must be
switched on (Position “I” [ON]).
1 =
EMERGENCY STOP
button
Put key into the key switch (5) and turn to
the right.
Only the platform control is activated for
installing the lift.
The lifting speed of the platform is approx. 12 m/min. or 24 m/min.
respectively.
Ascent
Press and hold the
UP
button (3).
Also press the button (2) to release the ascent.
The platform only moves while the
UP
(3) button and button (2) are
pressed.
Descent
1
5
3
2
4
5