Transport / storage
GEDA
®
3700 Z/ZP
Assembly Instructions
Page 14 of 60
ML034 GB 2017 / 11
Lift the platform extension on the base unit and secure using the
connecting screws.
Tightening torque bolts M20 = 400 Nm
When delivered, access doors and barriers are already fitted with
loading ramps. These may need to be moved when retrofitting
platform extensions.