GEDA
®
1500 Z / ZP
Page 89 of 114
Rev.: 004
BL 076 GB
Translation of the original operating manual
2011 / 03
15.5.2
Use of the assembly bridge
The assembly bridge is exclusively intended for the assembly of the mast
from the platform. Each time before using the platform, make sure that the
safety ratchet of the assembly bridge is fully engaged.
When the assembly bridge is open, the platform cannot be moved.
Therefore, before assembly of a mast bracket the platform must be
positioned so that the assembly bridge can be closed after assembly
(1.6 m distance, mast anchor to floor of the platform.)
Open assembly bridge
Release the safety ratchet (2), if necessary,
lightly pull the assembly bridge inwards using
the handle bar (3).
Push the handle bar (3) slowly out and pull the
bar (1).
Release the handle grip (3) and completely
lower the bridge using the bar (1).
Push outwards the front wall.
Close assembly bridge
Use the switch bar (1) and pull in the front wall.
Use the handle bar (3) to fully close the assembly bridge (the safety
ratchet (2) engages in the second sprocket).
15.5.3
Assemble trailing cable guide
The trailing cable guides ensure trouble-free transport of the cable to the
cable bin. Trailing cable guides must be mounted depending on the expected
wind pressure.
We recommend a distance of 6 m.
Assemble the trailing cable guide (1)
on the mast tube so that the guide
tube (2) is located central in the
trailing cable guide.
1
2
3
1
2