Install the first two mast anchors at a height of approx. 6 m.
After assembly of the mast anchoring, use a spirit level to check the
alignment of the base mast.
Further mast anchors are set at intervals of max. 10 m.
Attach the mast bracket (1) from the front to the round mast tube using
scaffold coupling (2).
(Tightening torque 50 Nm).
Engage telescopic tube (3). Close the clamps (4) and screw them
together so that the tube can still be adjusted.
To adjust the angle, release the nuts below the clamps (4) and move.
Re-tighten the nuts.
Re-tighten all 4 nuts.
The attachment plate should be bolted to the wall with anchor fittings or
through bolts. (See also the anchoring forces table.)
WARNING
Life-threatening hazard through fracture of the mast and falling
platform.
- until 2 mast anchors are in position or
- by negotiating the overhanging part of the mast
During assembly, observe the load-carrying capacity and maximum
overhanging length of mast for the individual types of platform
Rubric dimensions and weights.