Assembly / anchoring the mast
Assembly and anchoring of the mast is fundamentally carried out from the
platform and scaffolding. If assembling without scaffolding, anchoring to
the building using a mast bracket is carried out from the assembly bridge.
Load the platform.
Observe the max. payload.
Close the platform.
Press the UP button (platform control).
The platform stops automatically at the top end.
Lower the assembly guard.
Apply the mast
elements by hand.
Close and tighten the four eyebolts.
(Always extend masts in pairs).
WARNING
Life-threatening hazard
Mast brackets must be installed at the following distances.
First mast bracket at a height of 6 m.
Subsequent mast brackets every 10 metres.
After assembly of a mast bracket, the mast must be correctly aligned
using a spirit level.