GEDA
®
1500 Z / ZP
Page 84 of 114
Rev.: 004
BL 076 GB
Translation of the original operating manual
2011 / 03
15.4
Assemble cable bin and trailing cable bracket
Attach trailing cable bracket to the
sliding carriage.
Assemble the cable clamp to the
tension release.
Put the plug into the socket on the
sliding-carriage switch cabinet and
secure with a mounting clip.
Place the cable bin on the foot
section and bolt onto the round
mast tubes with both scaffold
couplings.
Align the cable bin so that the trailing cable
is centred as it moves through the trailing
cable guide.
Mount the first cable guide approx. 1 m
above the cable bin, to ensure the cable
spools in correctly.
After switching on the main switch (2), the green control light (3)
indicates that the system is ready for operation.
NOTE
If the green control light does not illuminate
refer to the Fault Table.
WARNING
Life-threatening hazard
After installation of the base unit, check to make sure that this is
secure and can be used by persons to assemble the mast. For
this, carry out a test run with an empty platform.
1
3