
GEDA
®
1500 Z / ZP
Page 78 of 114
Rev.: 004
BL 076 GB
Translation of the original operating manual
2011 / 03
14
Cleaning
Execution, necessary safety clothing, cleaning agents and equipment
according to the applicable instructions from the operating company.
14.1
Internal/external cleaning of the machine
Clean all surfaces thoroughly.
Clean switch cabinets and operating consoles separately.
Signpost wet areas and secure them against access.
14.2
Cleaning the area around the machine
The work methods, cleaning agents and equipment comply with the
applicable instructions of the operating company.
HAZARD
Life-threatening hazard
Risk of fire and explosion due to the use of
combustible cleaning agents.
Only use suitable, non-combustible cleaning
agents.
Do not use steam-jet equipment/high-pressure
cleaners. Electrical components can be damaged.
Do not touch sockets, cables or electrical
components with wet or damp hands.
Cleaning work on live components may only be
carried out by qualified electrical personnel.
Wear personal protective gear.