Operation
12.1
Daily inspections before starting work
To guarantee safety when working with the machine, the
supervisor/platform operator/person appointed by the operating company
is obliged to carry out a daily inspection of certain machine areas/parts.
Any defects identified must be reported immediately to a superior and
rectified. Faults may only be rectified by professionals responsible for
servicing and repairs.
Visual inspections must always be carried out before function checks.
Operation is prohibited until the defects are rectified. The following points
must be inspected daily.
12.1.1
Visual inspections
Entire machine
Damaged load-bearing elements/deformation.
Travel path of the machine unobstructed.
Loose or fallen parts
Damage to the platform.
Oil/grease
leaks.
Discolouration and contamination, corrosion, cracks.
Green control light goes on.
No objects on collision grille (e.g. quarry etc.)
Warning and instruction notices
All present and legible.
Safety equipment
All
present.
Functioning.
Not
manipulated.
Switch cabinets
Burnt/scorched
areas.
Discolouration.
Moisture.