39
Geberit Drainage Systems
System installation
Horizontal installation
For horizontal pipework the position of the expansion
joint will vary.
1
On the long runs of pipe with no branch connections,
the expansion fitting must be fitted at a maximum of
6 metre centres.
2
With branch connections, the expansion fitting must
be installed close to the ‘up stream’ end of any
branch. With multiple branches, the expansion fitting
must be allowed for all branches over 1 metre of
others. The expansion socket must be anchored to
the structure with a strong fixing.