ONE 7TS – Maintenance
7.4 Maintenance during run-in phase
The machine has been tested and checkd in the premises of the manufacturer, so it is ready for commission-
ing.
However the following run-in activities need to be carried out in the customer’s premises:
Data sheet
no
Frequency of
maintenance
Location Activity
00-[a]
00- [b]
After 50 hours in
run-in phase
Machine in general
- Check abnormal noise and vibra-
tions
-
Check protections and safety de-
vices
F [a]
After 500 hours
in run-in phase
Lubrication system
-
Check oil level and and top up if
needed
L [a]
After 200 hours
in run-in phase
Motordrive
- -Check belt tightness
7.5 Ordinary scheduled maintenance during operation
7.5.1 General
The tables below describe the periodic maintenance activities required to maintain the machine efficient and
safe.
The values indicated are valid for normal machine use; harsh conditions or particularly abrasive/aggressive
products can sensibly reduce the lifetime of some parts which will therefore need to be checked more fre-
quently.
In case of abnomal machine operation or abnormal noise level, you should try to identify the components
that can be causing the noise and verify that they are correctly mounted and tightened and if worn out re-
place the part.
WARNING:
The Periodic Maintenance tables below refer to normal operating conditions and are in no way to be
considered as a guarantee for minimum lifetime of the components indicated, but are merely an indi-
cation of the average lifetime.
Particular conditions such as high temperature, sterilization with steam and frequent washing, incor-
rect operating procedures, can significantly affect the lifetime of the machine and of its components,
and thus also vary the intervals between maintenance procedures on components of the compres-
sion head.
Scheduled maintenance procedures are performed with the following intervals:
pag 7.9
The presente manuale è of proprietà
GEA Niro Soavi S.p.A.
every riproduzione, anche parziale, è vietata.
Summary of Contents for ONE 11TS
Page 2: ...GEA Niro Soavi S p A COVER02 DOC REV DESCRIPTION DATE SIGN 0 1 EDITION 05 07 2011 ANC ...
Page 235: ......
Page 245: ......
Page 247: ......
Page 255: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 269: ......
Page 270: ......
Page 271: ......
Page 272: ......
Page 273: ......
Page 274: ......
Page 275: ......
Page 276: ......
Page 277: ......
Page 278: ......
Page 279: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ......
Page 285: ......