![GEA Futuro Instruction Manual And Installation Instructions Download Page 47](http://html1.mh-extra.com/html/gea/futuro/futuro_instruction-manual-and-installation-instructions_3992084047.webp)
Installation
Environmental prerequisites for setting up
2007-9015-001
03-2014
Pit for pump with a suction pipe and with an air riser
Refer to section on Installing a 6” [15 cm] riser for air flush
The length of pit is applicable to all configurations of intake and discharge
adaptors, with or without guillotine valve.
5.4
Environmental prerequisites for setting up
● The product must be installed in a well ventilated frost-free environment.