![GEA CONTRA CN Installation And Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/gea/contra-cn/contra-cn_installation-and-operating-instructions-manual_3974414022.webp)
Mounting, installation and connection
22
BA.10A.CNY.001.01.10.GB
4.5 Installation in the pipeline
W A R N I N G
!
Danger of mechanical overload!
A mechanical overload can cause death, bodily harm or dam-
age to the plant. Pumped liquid can leak under high pressure.
•
Do not use the pump or its connecting sleeves to support
the pipeline. (EN809 5.2.1.2.3 and EN ISO 14847).
•
In addition to the general rules of machine-building and
plant construction, also follow the instructions provided
by the manufacturer of the connecting elements used
(e.g., flanges) when installing the pump in the pipeline or
plant.
These specifications will contain data on torques, maxi-
mum allowable angular offset and tools / auxiliary materi-
als to be used.
•
It is absolutely necessary to avoid twisting the pump!
•
After connecting the pipes, check the alignment of the
coupling
1
.
C A U T I O N
!
Danger of mechanical overload due to closing caps or foil!
An overload can cause damage to pump or plant.
•
The suction and delivery ports are sealed with sheets of
plastic, the flushing and drain lines with plastic caps.
These must be removed before the pump is installed in
the system.
1.
For base plate design (CN) only