
GE H
EALTHCARE
RAFT
V
OLUSON
E8 / V
OLUSON
E6
D
IRECTION
KTD102576, R
EVISION
7
DRAFT (A
UGUST
23, 2012)
S
ERVICE
M
ANUAL
3-6
Section 3-3 - Receiving and Unpacking the Equipment
3.
Remove the left and right side walls, finally remove also the rear panel of the crate; the rear panel is used for the ramp.
4.
Carefully remove foam packing material and plastic bag from the ultrasound system and monitor.
Caution: Two people are needed in the next step due to the weight of the equipment.
5.
Disengage the brakes, grasp the system at the handle, then slowly move system down the ramp (bottom side of the rear panel).
Note: Packing crate and material should be stored for future use.
Table 3-4
Unpacking Procedure
Step
Task
remove side walls
finally remove rear panel
(used for the ramp)
rear panel
is used for ramp
(bottom side up)
NOTICE
!! NOTICE:
T
HE
SYSTEM
IS
L
OWERED
TO
ITS
MINIMUM
HEIGHT
,
WITH
MONITOR
FLAPPED
AND
L
OCKED
DOWN
.
T
HE
C
ONTROL
C
ONSOLE
IS
CENTERED
AND
LOCKED
IN
POSITION
.
Summary of Contents for Voluson E8
Page 2: ......
Page 11: ...GE HEALTHCARE VOLUSON E8 VOLUSON E6 DIRECTION KTD102576 REVISION 7 SERVICE MANUAL ix ZH CN KO...
Page 431: ......