GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
5 - 82
Section 5-10 - Power distribution
5-10-3
Power Up Sequence Description
5-10-3-1
Overview
The Power Up Sequence can be divided in the following steps:
1.) Connect the mains power to the VIVID E9 and switch AC Breaker to ON position.
2.) Press the ON button on the Operator Panel.
3.) BEP (and system) power-up.
5-10-3-2
AC Breaker to ON position
Connect the mains power to the VIVID E9 and switch AC Breaker to ON position:
•
The fans inside the Main Power Supply starts on a high speed and then settle to a lower speed.
•
+5V_STB (+5V DC Standby) power to BEP is turned on. It also gives power to the ON/OFF switch
on the OP so it can be used.
Figure 5-59 AC Breaker turned ON
100 - 230 VAC
AC POWER
BREAKER
FILTER /
INRUSH LIMIT
IEC SHIELD
DC/DC
+5V_STB
SINEWAVE
GENERATOR
DC
DC
115 VAC
CONVERTERS
USB
uP
+48V
BEP &
B/W
PRINTER
MOTOR
CONTROLLER
TX1
TX2
FEP +24V, +/-15V, +11V, +/-6V
FEP +/-100V (2x)
USB FROM BEP
AC_FAIL_N
ECT_SYNC
PSON_N
48V_OK
BEP
Main Power Supply
Summary of Contents for Vivid E9
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12...
Page 801: ......