GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
Chapter 5 - Components and functions (theory)
5 - 77
Section 5-10
Power distribution
5-10-1
Purpose of this section
The power distribution within the VIVID E9 is described in this section.
5-10-2
Main Power Supply
5-10-2-1
General description
The Main Power Supply’s main task is to galvanically isolate the scanner from the on-site Mains Power
System and to supply the various internal subsystems with AC or DC power.
Figure 5-55 Main Power Supply Principle
MLP
Line Filter
Rectifier
Inrush Current
Limiter
PFC
Stand By
+ 5Vstb (12W)
+ 24V
24V
± 48V
+ 48V
+ 15V
+ 12V
+ 6V
TLP
± 0 – 95V
± 0 – 95V
2X20W
IEC60601-1
Isolation
400V
90-250Vac
0-140V
0-140V
130W
Inverter
110V
120VA
113 – 400 V
+ 48V
– 15V
– 6V
- 48V
PMX
± 100 V
8W
+/- 48V
SELV outputs (<60Vdc)
Summary of Contents for Vivid E9
Page 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5...
Page 2: ......
Page 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO...
Page 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii...
Page 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12...
Page 801: ......